Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 31152 | Ice Cream and Frozen Dessert Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1018 # 09 Y:2020 | 09 | 2020 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $1,096,761 | $5,000,000 | Not Implemented |
UD1018 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $359 | $392 | Not Implemented |
UD1018 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,072 | $0 | Not Implemented |
UD1018 # 06 Y:2020 | 06 | 2020 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $16,717 | $64,900 | Not Implemented |
UD1018 # 05 Y:2020 | 05 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,584 | $1,500 | Not Implemented |
UD1018 # 04 Y:2020 | 04 | 2020 | REDESIGN PROCESS | $43,180 | $20,000 | Not Implemented |
UD1018 # 03 Y:2020 | 03 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $25,124 | $0 | Not Implemented |
UD1018 # 02 Y:2020 | 02 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,174 | $26,600 | Not Implemented |
UD1018 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $0 | Not Implemented |
UD0938 # 02 Y:2015 | 02 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,298 | $0 | Implemented |
UD0938 # 11 Y:2015 | 11 | 2015 | MINIMIZE WATER USAGE | $27,153 | $9,300 | Not Implemented |
UD0938 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,880 | $15,000 | Not Implemented |
UD0938 # 09 Y:2015 | 09 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $807 | $3,133 | Not Implemented |
UD0938 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,596 | $20,100 | Not Implemented |
UD0938 # 07 Y:2015 | 07 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $152 | $530 | Implemented |
UD0938 # 06 Y:2015 | 06 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,415 | $0 | Implemented |
UD0938 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $29,938 | $3,000 | Not Implemented |
UD0938 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $107,431 | $0 | Not Implemented |
UD0938 # 03 Y:2015 | 03 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,403 | $0 | Not Implemented |
UD0938 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $39,463 | $0 | Not Implemented |
WV0502 # 01 Y:2015 | 01 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,685 | $1,000 | Implemented |
WV0502 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,334 | $25,930 | Implemented |
WV0502 # 03 Y:2015 | 03 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $12,681 | $18,000 | Implemented |
WV0502 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,838 | $20,000 | Not Implemented |
WV0502 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,333 | $2,500 | Not Implemented |