Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101
matching recommendationsNAICS | 31152 | Ice Cream and Frozen Dessert Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0643 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,370 | $50 | Implemented |
AM0643 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $2,700 | $1,800 | Not Implemented |
AM0643 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $1,940 | $235 | Implemented |
AM0643 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,900 | $500 | Implemented |
AM0643 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,960 | $500 | Implemented |
AM0643 # 07 Y:2013 | 07 | 2013 | USE SYNTHETIC LUBRICANT | $1,887 | $0 | Not Implemented |
AM0643 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $307 | $157 | Not Implemented |
AM0643 # 09 Y:2013 | 09 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $250 | $126 | Not Implemented |
AM0643 # 01 Y:2013 | 01 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $34,060 | $250,000 | Implemented |
MZ0092 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,312 | $28,500 | Not Implemented |
MZ0092 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $567 | $140 | Implemented |
MZ0092 # 09 Y:2012 | 09 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $512 | $212 | Not Implemented |
MZ0092 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,645 | $26,468 | Not Implemented |
MZ0092 # 01 Y:2012 | 01 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $14,965 | $4,500 | Implemented |
MZ0092 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,547 | $26,468 | Not Implemented |
MZ0092 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $6,999 | $3,738 | Implemented |
MZ0092 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,594 | $1,000 | Implemented |
MZ0092 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,516 | $263 | Implemented |
LE0290 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,543 | $750 | Implemented |
LE0290 # 06 Y:2009 | 06 | 2009 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,400 | $500 | Not Implemented |
LE0290 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,929 | $2,000 | Not Implemented |
LE0290 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,837 | $15,700 | Not Implemented |
LE0290 # 08 Y:2009 | 08 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,204 | $2,500 | Implemented |
LE0290 # 07 Y:2009 | 07 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,267 | $0 | Implemented |
LE0290 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,385 | $1,200 | Not Implemented |