IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
NAICS 31152 Ice Cream and Frozen Dessert Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1016 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,210 $730 Not Implemented
OK1016 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,028 $28,358 Implemented
OK1016 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,766 $9,480 Not Implemented
OK1016 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,330 $0 Implemented
OK1016 # 05 Y:2019 05 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,523 $0 Not Implemented
OK1016 # 06 Y:2019 06 2019 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $885 $4,860 Not Implemented
OK1016 # 07 Y:2019 07 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $485 $636 Implemented
SU0481 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $2,630 $0 Not Implemented
SU0481 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,034 $28 Implemented
SU0481 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $1,779 $1,023 Not Implemented
SU0481 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,137 $13,202 Implemented
SU0481 # 05 Y:2019 05 2019 ELIMINATE/REDUCE AN OPERATION $1,649 $2,041 Not Implemented
SU0481 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $305 $360 Implemented
SU0481 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $640 $1,168 Not Implemented
SU0481 # 08 Y:2019 08 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,126 $15,784 Not Implemented
SU0481 # 09 Y:2019 09 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $331 $996 Not Implemented