Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,427
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0792 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,993 | $0 | n/a |
OR0792 # 07 Y:2024 | 07 | 2024 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $395,376 | $1,242,029 | n/a |
OR0792 # 05 Y:2024 | 05 | 2024 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $7,380 | $6,624 | n/a |
OR0792 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,667 | $3,106 | n/a |
OR0792 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,357 | $3,090 | n/a |
OR0792 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,081 | $1,119 | n/a |
OR0792 # 03 Y:2024 | 03 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $37,200 | $18,409 | n/a |
GT0975 # 06 Y:2024 | 06 | 2024 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $4,603 | $11,665 | n/a |
GT0975 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $442 | $197 | n/a |
GT0975 # 04 Y:2024 | 04 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $39,992 | $87,500 | n/a |
GT0975 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,280 | $1,334 | n/a |
GT0975 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,668 | $2,732 | n/a |
GT0975 # 05 Y:2024 | 05 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $770 | $1,850 | n/a |
GT0975 # 07 Y:2024 | 07 | 2024 | MINIMIZE WATER USAGE | $64,161 | $237,800 | n/a |
MI0433 # 05 Y:2023 | 05 | 2023 | PAY UTILITY BILLS ON TIME | $202 | $0 | n/a |
MI0433 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,622 | $1,720 | n/a |
MI0433 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,297 | $1,752 | n/a |
MI0433 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,706 | $3,257 | n/a |
MI0433 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,476 | $80 | n/a |
AM0897 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $520 | $102 | n/a |
AM0897 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $32,420 | $45,905 | n/a |
AM0897 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $620 | $0 | n/a |
AM0897 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $460 | $98 | n/a |
AM0897 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $215 | $100 | n/a |
AM0897 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,060 | $4,860 | n/a |