Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,440
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0592 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,361 | $3,915 | n/a |
LE0592 # 09 Y:2025 | 09 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $513 | $2,500 | n/a |
LE0592 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,485 | $7,000 | n/a |
LE0592 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,457 | $100 | n/a |
LE0592 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,366 | $3,000 | n/a |
LE0592 # 06 Y:2025 | 06 | 2025 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $12,213 | $24,000 | n/a |
LE0592 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,842 | $126,000 | n/a |
LE0592 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,195 | $4,000 | n/a |
LE0592 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,177 | $26,000 | n/a |
LS2501 # 01 Y:2025 | 01 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,529 | $0 | n/a |
LS2501 # 03 Y:2025 | 03 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $12,000 | $10,000 | n/a |
LS2501 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $536 | $90 | n/a |
LS2501 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $71,253 | $442,396 | n/a |
OR0792 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,081 | $1,119 | n/a |
OR0792 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,993 | $0 | n/a |
OR0792 # 05 Y:2024 | 05 | 2024 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $7,380 | $6,624 | n/a |
OR0792 # 03 Y:2024 | 03 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $37,200 | $18,409 | n/a |
OR0792 # 07 Y:2024 | 07 | 2024 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $395,376 | $1,242,029 | n/a |
OR0792 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,667 | $3,106 | n/a |
OR0792 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,357 | $3,090 | n/a |
GT0975 # 05 Y:2024 | 05 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $770 | $1,850 | Implemented |
GT0975 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,280 | $1,334 | Not Implemented |
GT0975 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $442 | $197 | Not Implemented |
GT0975 # 06 Y:2024 | 06 | 2024 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $4,603 | $11,665 | Implemented |
GT0975 # 07 Y:2024 | 07 | 2024 | MINIMIZE WATER USAGE | $64,161 | $237,800 | Implemented |