IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

577

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0903 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,339 $3,360 Implemented
GT0903 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,199 $23,157 Implemented
SF0502 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,509 $80 Implemented
SF0502 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $379,684 $84,889 Implemented
SF0502 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,648 $2,311 Implemented
SF0502 # 05 Y:2017 05 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $21,631 $14,971 Implemented
SF0502 # 06 Y:2017 06 2017 REDESIGN PROCESS $46,628 $18,660 Implemented
SF0502 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,288 $138,203 Implemented
SF0502 # 08 Y:2017 08 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $11,335 $14,290 Implemented
AM0730 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,220 $20 Implemented
AM0730 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $890 $2,140 Implemented
AM0730 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $500 Implemented
SU0439 # 01 Y:2017 01 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,112 $0 Implemented
SU0439 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $947 $0 Implemented
SU0439 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $38 $0 Implemented
SU0439 # 04 Y:2017 04 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $23 $0 Implemented
SU0439 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $551 $450 Implemented
SU0439 # 06 Y:2017 06 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $98 $342 Implemented
SU0439 # 07 Y:2017 07 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,395 $41,742 Implemented
UD0965 # 03 Y:2017 03 2017 USE AUTOMATIC CLEANING EQUIPMENT $15,770 $0 Implemented
UD0965 # 04 Y:2017 04 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,437 $700 Implemented
UD0965 # 05 Y:2017 05 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,366 $2,000 Implemented
UD0965 # 09 Y:2017 09 2017 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $5,101 $0 Implemented
UD0965 # 10 Y:2017 10 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $41,935 $20,000 Implemented
UD0965 # 11 Y:2017 11 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $560 $300 Implemented