Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0420 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $65,480 | $580 | Implemented |
MI0420 # 04 Y:2023 | 04 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $22,620 | $52,100 | Implemented |
MI0420 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,797 | $0 | Implemented |
MI0420 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,309 | $1,980 | Implemented |
MI0420 # 09 Y:2023 | 09 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,456 | $280 | Implemented |
MI0420 # 10 Y:2023 | 10 | 2023 | PAY UTILITY BILLS ON TIME | $111 | $0 | Implemented |
MI0147 # 02 Y:2007 | 02 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,498 | $1,750 | Implemented |
MI0147 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,305 | $7,878 | Implemented |
MI0147 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $20,581 | $16,000 | Implemented |
UF0345 # 06 Y:2004 | 06 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,882 | $3,496 | Implemented |
UF0345 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $519 | $525 | Implemented |
UF0345 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,734 | $8,430 | Implemented |
UF0345 # 03 Y:2004 | 03 | 2004 | ADD AREA LIGHTING SWITCHES | $2,283 | $2,910 | Implemented |
UF0345 # 02 Y:2004 | 02 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $9,242 | $24,500 | Implemented |
UF0345 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,479 | $18,128 | Implemented |
UF0340 # 08 Y:2004 | 08 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,678 | $7,900 | Implemented |
UF0340 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,682 | $400 | Implemented |
UF0340 # 05 Y:2004 | 05 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,480 | $40,000 | Implemented |
UF0340 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,590 | $48,289 | Implemented |