IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,413

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0260 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,928 $300 Not Implemented
TT0260 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $10,005 $10,000 Not Implemented
TT0260 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,890 $3,640 Not Implemented
SF0573 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $56,800 $266,176 Implemented
SF0573 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,292 $4,273 Implemented
SF0573 # 04 Y:2021 04 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,654 $960 Not Implemented
SF0573 # 03 Y:2021 03 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $514 $105 Implemented
SF0573 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $4,133 $0 Implemented
SF0573 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $718 $0 Implemented
LE0508 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,328 $100 Implemented
LE0508 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,709 $29,000 Not Implemented
LE0508 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,110 $10,000 Implemented
LE0508 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,625 $3,000 Implemented
LE0508 # 05 Y:2021 05 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,407 $24,000 Implemented
MZ0309 # 01 Y:2021 01 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $65,174 $960 Implemented
MZ0309 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,714 $960 Implemented
MZ0309 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,876 $42,513 Not Implemented
MZ0309 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,649 $4,200 Implemented
MZ0309 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,736 $4,920 Implemented
MZ0309 # 06 Y:2021 06 2021 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $353,125 $770,000 Not Implemented
MZ0309 # 07 Y:2021 07 2021 OPTIMIZE PLANT POWER FACTOR $354,701 $442,138 Implemented
WV0598 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $564 $613 Implemented
WV0598 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $916 $1,021 Implemented
WV0598 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $1,467 $3,170 Implemented
WV0598 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $7,292 $6,768 Implemented