IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,427

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0317 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,246 $4,000 Implemented
MZ0317 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $50,287 $477,500 Not Implemented
MZ0317 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,898 $0 Not Implemented
NL0064 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $1,251 $1,729 Implemented
NL0064 # 01 Y:2022 01 2022 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $79,442 $292,000 Implemented
NL0064 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $2,875 Implemented
NL0064 # 04 Y:2022 04 2022 USE HIGH PRESSURE WASH SYSTEMS $768 $240 Implemented
NL0064 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $331 $90 Implemented
NL0064 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $204 $130 Implemented
TT0260 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $401 $553 Implemented
TT0260 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $783 $700 Implemented
TT0260 # 06 Y:2021 06 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,508 $3,500 Not Implemented
TT0260 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,791 $1,660 Not Implemented
TT0260 # 04 Y:2021 04 2021 REPLACE TREATED WATER WITH WELL / SURFACE WATER $4,069 $16,500 Not Implemented
TT0260 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,928 $300 Not Implemented
TT0260 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $10,005 $10,000 Not Implemented
TT0260 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,890 $3,640 Not Implemented
SF0573 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $56,800 $266,176 Implemented
SF0573 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,292 $4,273 Implemented
SF0573 # 04 Y:2021 04 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,654 $960 Not Implemented
SF0573 # 03 Y:2021 03 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $514 $105 Implemented
SF0573 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $4,133 $0 Implemented
SF0573 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $718 $0 Implemented
LE0508 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,328 $100 Implemented
LE0508 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,709 $29,000 Not Implemented