IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0975 # 05 Y:2024 05 2024 REPAIR AND ELIMINATE STEAM LEAKS $770 $1,850 n/a
GT0975 # 06 Y:2024 06 2024 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $4,603 $11,665 n/a
GT0975 # 04 Y:2024 04 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $39,992 $87,500 n/a
GT0975 # 01 Y:2024 01 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $442 $197 n/a
GT0975 # 07 Y:2024 07 2024 MINIMIZE WATER USAGE $64,161 $237,800 n/a
GT0975 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $1,334 n/a
GT0975 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,668 $2,732 n/a
GT0943 # 06 Y:2020 06 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $27,227 $225,984 Not Implemented
GT0943 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $736 $1,938 Implemented
GT0943 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,306 $3,500 Implemented
GT0943 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $490 $350 Not Implemented
GT0943 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,323 $2,678 Implemented
GT0943 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,005 $563 Implemented
GT0903 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $295 $100 Implemented
GT0903 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $1,830 $975 Not Implemented
GT0903 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $308 $267 Implemented
GT0903 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,339 $3,360 Implemented
GT0903 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,199 $23,157 Implemented
GT0903 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $58,540 $613,275 Not Implemented
GT0880 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,232 $38,000 Not Implemented
GT0880 # 06 Y:2011 06 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,994 $5,000 Not Implemented
GT0880 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $70,097 $17,000 Implemented
GT0880 # 04 Y:2011 04 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $75,872 $100,115 Implemented
GT0880 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,390 $244 Not Implemented
GT0880 # 02 Y:2011 02 2011 USE SYNTHETIC LUBRICANT $13,152 $0 Not Implemented