Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0551 # 03 Y:2023 | 03 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $111,339 | $525,000 | Implemented |
LE0551 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $203 | $300 | Not Implemented |
LE0551 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $69,768 | $5,000 | Implemented |
LE0416 # 02 Y:2016 | 02 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $22,973 | $9,000 | Implemented |
LE0416 # 16 Y:2016 | 16 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $704 | $3,408 | Implemented |
LE0416 # 15 Y:2016 | 15 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $19,802 | $88,000 | Not Implemented |
LE0416 # 14 Y:2016 | 14 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,762 | $103,000 | Not Implemented |
LE0416 # 13 Y:2016 | 13 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $302,516 | $1,300,000 | Not Implemented |
LE0416 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,521 | $4,533 | Implemented |
LE0416 # 11 Y:2016 | 11 | 2016 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $32,117 | $87,100 | Not Implemented |
LE0416 # 10 Y:2016 | 10 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,177 | $6,325 | Not Implemented |
LE0416 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,545 | $31,000 | Not Implemented |
LE0416 # 08 Y:2016 | 08 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,266 | $33,000 | Not Implemented |
LE0416 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $82,969 | $110,000 | Not Implemented |
LE0416 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $85,792 | $97,000 | Implemented |
LE0416 # 05 Y:2016 | 05 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,285 | $11,000 | Not Implemented |
LE0416 # 04 Y:2016 | 04 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,534 | $19,000 | Not Implemented |
LE0416 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,060 | $4,550 | Not Implemented |
LE0416 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $43,389 | $1,000 | Implemented |
WV0353 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $187,287 | $59,000 | Not Implemented |
WV0353 # 02 Y:2007 | 02 | 2007 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $133,786 | $400,000 | Not Implemented |
WV0353 # 03 Y:2007 | 03 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $48,101 | $4,000 | Implemented |
WV0353 # 04 Y:2007 | 04 | 2007 | INCREASE AMOUNT OF CONDENSATE RETURNED | $24,450 | $50,000 | Not Implemented |
WV0353 # 05 Y:2007 | 05 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,839 | $2,960 | Not Implemented |
WV0353 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,776 | $300 | Implemented |