Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0260 # 08 Y:2021 | 08 | 2021 | INSTALL OCCUPANCY SENSORS | $401 | $553 | Implemented |
TT0260 # 07 Y:2021 | 07 | 2021 | INSULATE BARE EQUIPMENT | $783 | $700 | Implemented |
TT0260 # 06 Y:2021 | 06 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,508 | $3,500 | Not Implemented |
TT0260 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,791 | $1,660 | Not Implemented |
TT0260 # 04 Y:2021 | 04 | 2021 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $4,069 | $16,500 | Not Implemented |
TT0260 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,928 | $300 | Not Implemented |
TT0260 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $10,005 | $10,000 | Not Implemented |
TT0260 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,890 | $3,640 | Not Implemented |
SF0573 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,133 | $0 | Implemented |
SF0573 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,800 | $266,176 | Implemented |
SF0573 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,292 | $4,273 | Implemented |
SF0573 # 04 Y:2021 | 04 | 2021 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,654 | $960 | Not Implemented |
SF0573 # 03 Y:2021 | 03 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $514 | $105 | Implemented |
SF0573 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $718 | $0 | Implemented |
LE0508 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,328 | $100 | Implemented |
LE0508 # 05 Y:2021 | 05 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,407 | $24,000 | Implemented |
LE0508 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,625 | $3,000 | Implemented |
LE0508 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,110 | $10,000 | Implemented |
LE0508 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,709 | $29,000 | Not Implemented |
MZ0309 # 07 Y:2021 | 07 | 2021 | OPTIMIZE PLANT POWER FACTOR | $354,701 | $442,138 | Implemented |
MZ0309 # 06 Y:2021 | 06 | 2021 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $353,125 | $770,000 | Not Implemented |
MZ0309 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,736 | $4,920 | Implemented |
MZ0309 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,649 | $4,200 | Implemented |
MZ0309 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,876 | $42,513 | Not Implemented |
MZ0309 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,714 | $960 | Implemented |