IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0075 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $1,652 Implemented
NL0075 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $7,755 $28,900 Not Implemented
NL0075 # 01 Y:2022 01 2022 AIR CONDITION ONLY SPACE NECESSARY $13,412 $7,500 Implemented
NL0075 # 04 Y:2022 04 2022 INSULATE BARE EQUIPMENT $980 $404 Implemented
NL0075 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $635 $575 Not Implemented
NL0071 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $407 $2,521 Implemented
NL0071 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $4,500 Implemented
NL0071 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $2,400 $9,724 Implemented
NL0071 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $3,139 $8,000 Not Implemented
NL0071 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,879 $30,410 Implemented
NL0071 # 02 Y:2022 02 2022 MINIMIZE WATER USAGE $106,955 $72,150 Implemented
NL0071 # 01 Y:2022 01 2022 REPLACE BOILER $280,847 $220,000 Not Implemented
MZ0333 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,542 $3,330 Not Implemented
MZ0333 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,752 $66 Not Implemented
MZ0333 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,733 $1,330 Not Implemented
MZ0333 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,379 $21,815 Not Implemented
MZ0317 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $50,287 $477,500 Not Implemented
MZ0317 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,246 $4,000 Implemented
MZ0317 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $607 $800 Implemented
MZ0317 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,392 $12,626 Implemented
MZ0317 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,898 $0 Not Implemented
NL0064 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $331 $90 Implemented
NL0064 # 04 Y:2022 04 2022 USE HIGH PRESSURE WASH SYSTEMS $768 $240 Implemented
NL0064 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $2,875 Implemented
NL0064 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $1,251 $1,729 Implemented