Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,431
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2501 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $71,253 | $442,396 | n/a |
LS2501 # 01 Y:2025 | 01 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,529 | $0 | n/a |
LS2501 # 03 Y:2025 | 03 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $12,000 | $10,000 | n/a |
LS2501 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $536 | $90 | n/a |
OR0792 # 03 Y:2024 | 03 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $37,200 | $18,409 | n/a |
OR0792 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,357 | $3,090 | n/a |
OR0792 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,993 | $0 | n/a |
OR0792 # 07 Y:2024 | 07 | 2024 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $395,376 | $1,242,029 | n/a |
OR0792 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,081 | $1,119 | n/a |
OR0792 # 05 Y:2024 | 05 | 2024 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $7,380 | $6,624 | n/a |
OR0792 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,667 | $3,106 | n/a |
GT0975 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,668 | $2,732 | n/a |
GT0975 # 04 Y:2024 | 04 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $39,992 | $87,500 | n/a |
GT0975 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,280 | $1,334 | n/a |
GT0975 # 07 Y:2024 | 07 | 2024 | MINIMIZE WATER USAGE | $64,161 | $237,800 | n/a |
GT0975 # 06 Y:2024 | 06 | 2024 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $4,603 | $11,665 | n/a |
GT0975 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $442 | $197 | n/a |
GT0975 # 05 Y:2024 | 05 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $770 | $1,850 | n/a |
MI0433 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,297 | $1,752 | n/a |
MI0433 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,706 | $3,257 | n/a |
MI0433 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,476 | $80 | n/a |
MI0433 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,622 | $1,720 | n/a |
MI0433 # 05 Y:2023 | 05 | 2023 | PAY UTILITY BILLS ON TIME | $202 | $0 | n/a |
AM0897 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $520 | $102 | n/a |
AM0897 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,060 | $4,860 | n/a |