IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,431

matching recommendations
Reset
NAICS 31161 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2501 # 04 Y:2025 04 2025 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $71,253 $442,396 n/a
LS2501 # 01 Y:2025 01 2025 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,529 $0 n/a
LS2501 # 03 Y:2025 03 2025 INSTALL AN UNINTERUPTABLE POWER SUPPLY $12,000 $10,000 n/a
LS2501 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $536 $90 n/a
OR0792 # 03 Y:2024 03 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $37,200 $18,409 n/a
OR0792 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $6,357 $3,090 n/a
OR0792 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,993 $0 n/a
OR0792 # 07 Y:2024 07 2024 PURCHASE EQUIPMENT INSTEAD OF LEASING $395,376 $1,242,029 n/a
OR0792 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,081 $1,119 n/a
OR0792 # 05 Y:2024 05 2024 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,380 $6,624 n/a
OR0792 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $2,667 $3,106 n/a
GT0975 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,668 $2,732 n/a
GT0975 # 04 Y:2024 04 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $39,992 $87,500 n/a
GT0975 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $1,334 n/a
GT0975 # 07 Y:2024 07 2024 MINIMIZE WATER USAGE $64,161 $237,800 n/a
GT0975 # 06 Y:2024 06 2024 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $4,603 $11,665 n/a
GT0975 # 01 Y:2024 01 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $442 $197 n/a
GT0975 # 05 Y:2024 05 2024 REPAIR AND ELIMINATE STEAM LEAKS $770 $1,850 n/a
MI0433 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $1,297 $1,752 n/a
MI0433 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,706 $3,257 n/a
MI0433 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,476 $80 n/a
MI0433 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,622 $1,720 n/a
MI0433 # 05 Y:2023 05 2023 PAY UTILITY BILLS ON TIME $202 $0 n/a
AM0897 # 04 Y:2024 04 2024 USE PHOTOCELL CONTROLS $520 $102 n/a
AM0897 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $4,860 n/a