IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,427

matching recommendations
Reset
NAICS 31161 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0749 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,109 $5,410 Not Implemented
AM0749 # 08 Y:2018 08 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $623 $140 Not Implemented
MI0329 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,609 $40 Implemented
MI0329 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,815 $1,746 Not Implemented
MI0329 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $7,784 $636 Not Implemented
MI0329 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,950 $1,660 Implemented
MI0329 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,453 $2,520 Implemented
MI0329 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,257 $10,017 Implemented
MI0329 # 07 Y:2018 07 2018 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,580 $460 Implemented
MI0329 # 08 Y:2018 08 2018 OPTIMIZE PLANT POWER FACTOR $3,469 $12,235 Not Implemented
MI0329 # 09 Y:2018 09 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,990 $4,250 Not Implemented
MI0329 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $2,804 $1,060 Implemented
MI0329 # 11 Y:2018 11 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $535 $40 Implemented
UK1802 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $35,828 $14,140 Not Implemented
UK1802 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,526 $19,379 Not Implemented
UK1802 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,079 $2,780 Not Implemented
UK1802 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,905 $1,700 Not Implemented
UK1802 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,533 $0 Not Implemented
UK1802 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,227 $507 Not Implemented
UK1802 # 07 Y:2018 07 2018 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $3,271 $679 Not Implemented
UK1802 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,127 $0 Not Implemented
UK1802 # 09 Y:2018 09 2018 INSULATE BARE EQUIPMENT $439 $224 Not Implemented
UK1802 # 10 Y:2018 10 2018 USE MINIMUM STEAM OPERATING PRESSURE $372 $0 Not Implemented
UK1802 # 11 Y:2018 11 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $42,791 $10,639 Not Implemented
AM0747 # 01 Y:2018 01 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $170,240 $376,350 Not Implemented