Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,427
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS0002 # 01 Y:2017 | 01 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,531 | $0 | Not Implemented |
LS0002 # 02 Y:2017 | 02 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $33,634 | $0 | Not Implemented |
LS0002 # 03 Y:2017 | 03 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,124 | $0 | Not Implemented |
LS0002 # 04 Y:2017 | 04 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $16,140 | $0 | Not Implemented |
LS0002 # 05 Y:2017 | 05 | 2017 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $271,330 | $0 | Not Implemented |
LS0002 # 06 Y:2017 | 06 | 2017 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $8,736 | $0 | Not Implemented |
SU0439 # 01 Y:2017 | 01 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,112 | $0 | Implemented |
SU0439 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $947 | $0 | Implemented |
SU0439 # 03 Y:2017 | 03 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $38 | $0 | Implemented |
SU0439 # 04 Y:2017 | 04 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $23 | $0 | Implemented |
SU0439 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $551 | $450 | Implemented |
SU0439 # 06 Y:2017 | 06 | 2017 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $98 | $342 | Implemented |
SU0439 # 07 Y:2017 | 07 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,395 | $41,742 | Implemented |
AM0730 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $1,220 | $20 | Implemented |
AM0730 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $890 | $2,140 | Implemented |
AM0730 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $760 | $10 | Not Implemented |
AM0730 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $500 | Implemented |
UD0965 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,857 | $0 | Not Implemented |
UD0965 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $303 | $0 | Not Implemented |
UD0965 # 03 Y:2017 | 03 | 2017 | USE AUTOMATIC CLEANING EQUIPMENT | $15,770 | $0 | Implemented |
UD0965 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,437 | $700 | Implemented |
UD0965 # 05 Y:2017 | 05 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,366 | $2,000 | Implemented |
UD0965 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,440 | $80,000 | Not Implemented |
UD0965 # 07 Y:2017 | 07 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,537 | $10,000 | Not Implemented |
UD0965 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,342 | $200 | Not Implemented |