Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0969 # 09 Y:2017 | 09 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,251 | $30 | Implemented |
UD0969 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,470 | $2,500 | Not Implemented |
UD0969 # 06 Y:2017 | 06 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $22,591 | $63,800 | Implemented |
UD0969 # 08 Y:2017 | 08 | 2017 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $6,275 | $5,250 | Not Implemented |
UD0969 # 07 Y:2017 | 07 | 2017 | REDUCE EXCESS STEAM BLEEDING | $6,926 | $1,050 | Not Implemented |
UD0969 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,419 | $1,000 | Implemented |
UD0969 # 10 Y:2017 | 10 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,536 | $6,000 | Not Implemented |
UD0969 # 12 Y:2017 | 12 | 2017 | INSTALL TURBULATORS | $795 | $1,250 | Not Implemented |
UD0969 # 11 Y:2017 | 11 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,502 | $844 | Implemented |
UD0969 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,188 | $30 | Implemented |
UD0969 # 02 Y:2017 | 02 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,357 | $30 | Implemented |
UD0965 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,081 | $1,230 | Implemented |
UD0965 # 11 Y:2017 | 11 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $560 | $300 | Implemented |
UD0965 # 10 Y:2017 | 10 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $41,935 | $20,000 | Implemented |
UD0965 # 09 Y:2017 | 09 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $5,101 | $0 | Implemented |
UD0965 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,342 | $200 | Not Implemented |
UD0965 # 07 Y:2017 | 07 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,537 | $10,000 | Not Implemented |
UD0965 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,440 | $80,000 | Not Implemented |
UD0965 # 05 Y:2017 | 05 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,366 | $2,000 | Implemented |
UD0965 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,437 | $700 | Implemented |
UD0965 # 03 Y:2017 | 03 | 2017 | USE AUTOMATIC CLEANING EQUIPMENT | $15,770 | $0 | Implemented |
UD0965 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $303 | $0 | Not Implemented |
UD0965 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,857 | $0 | Not Implemented |
UD0899 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,635 | $3,920 | Not Implemented |
UD0899 # 05 Y:2014 | 05 | 2014 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $2,075 | $0 | Implemented |