Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0081 # 11 Y:2012 | 11 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,412 | $720 | Not Implemented |
DL0081 # 10 Y:2012 | 10 | 2012 | REDUCE VENTILATION AIR | $26,354 | $4,500 | Implemented |
DL0081 # 09 Y:2012 | 09 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $16,536 | $25,000 | Not Implemented |
DL0081 # 08 Y:2012 | 08 | 2012 | IMPROVE COMBUSTION CONTROL CAPABILITY | $16,536 | $8,900 | Not Implemented |
DL0081 # 07 Y:2012 | 07 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,257 | $28,000 | Not Implemented |
DL0081 # 06 Y:2012 | 06 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,850 | $4,500 | Not Implemented |
DL0081 # 05 Y:2012 | 05 | 2012 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $18,222 | $42,000 | Not Implemented |
DL0081 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,818 | $54,000 | Implemented |
DL0081 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,801 | $36,000 | Implemented |
DL0081 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $51,870 | $24,400 | Implemented |
DL0081 # 01 Y:2012 | 01 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $323,076 | $500,000 | Not Implemented |
DL0072 # 13 Y:2011 | 13 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,200 | $6,125 | Implemented |
DL0072 # 14 Y:2011 | 14 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,009 | $1,045 | Not Implemented |
DL0072 # 01 Y:2011 | 01 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $282,000 | $500,000 | Not Implemented |
DL0072 # 12 Y:2011 | 12 | 2011 | REDUCE VENTILATION AIR | $44,740 | $4,400 | Implemented |
DL0072 # 11 Y:2011 | 11 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $26,800 | $5,500 | Not Implemented |
DL0072 # 10 Y:2011 | 10 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $27,520 | $65,000 | Not Implemented |
DL0072 # 09 Y:2011 | 09 | 2011 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $24,840 | $2,500 | Implemented |
DL0072 # 08 Y:2011 | 08 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,150 | $13,000 | Implemented |
DL0072 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,600 | $12,840 | Not Implemented |
DL0072 # 06 Y:2011 | 06 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,200 | $34,175 | Not Implemented |
DL0072 # 05 Y:2011 | 05 | 2011 | REDESIGN PROCESS | $50,600 | $5,000 | Not Implemented |
DL0072 # 04 Y:2011 | 04 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $44,400 | $2,000 | Not Implemented |
DL0072 # 03 Y:2011 | 03 | 2011 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $19,600 | $5,000 | Not Implemented |
DL0072 # 02 Y:2011 | 02 | 2011 | OPERATE BOILERS ON HIGH FIRE SETTING | $136,800 | $100,000 | Not Implemented |