Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
141
matching recommendationsNAICS | 311611 | Animal (except Poultry) Slaughtering |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0086 # 03 Y:2023 | 03 | 2023 | METER WASTE WATER | $4,239 | $1,348 | Implemented |
NL0086 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $6,202 | $6,211 | Implemented |
MI0420 # 04 Y:2023 | 04 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $22,620 | $52,100 | Implemented |
MI0420 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $65,480 | $580 | Implemented |
MI0420 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,309 | $1,980 | Implemented |
MI0420 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,797 | $0 | Implemented |
MI0420 # 10 Y:2023 | 10 | 2023 | PAY UTILITY BILLS ON TIME | $111 | $0 | Implemented |
MI0420 # 09 Y:2023 | 09 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,456 | $280 | Implemented |
NL0071 # 02 Y:2022 | 02 | 2022 | MINIMIZE WATER USAGE | $106,955 | $72,150 | Implemented |
NL0071 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $4,500 | Implemented |
NL0071 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,879 | $30,410 | Implemented |
NL0071 # 07 Y:2022 | 07 | 2022 | INSULATE BARE EQUIPMENT | $407 | $2,521 | Implemented |
NL0071 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,400 | $9,724 | Implemented |
TT0260 # 08 Y:2021 | 08 | 2021 | INSTALL OCCUPANCY SENSORS | $401 | $553 | Implemented |
TT0260 # 07 Y:2021 | 07 | 2021 | INSULATE BARE EQUIPMENT | $783 | $700 | Implemented |
NL0039 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $36,367 | $39,000 | Implemented |
NL0039 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,739 | $1,600 | Implemented |
NL0039 # 04 Y:2019 | 04 | 2019 | MINIMIZE WATER USAGE | $10,832 | $1,127 | Implemented |
NL0039 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,128 | $2,497 | Implemented |
NL0039 # 02 Y:2019 | 02 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $15,324 | $44 | Implemented |
UD0965 # 10 Y:2017 | 10 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $41,935 | $20,000 | Implemented |
UD0965 # 03 Y:2017 | 03 | 2017 | USE AUTOMATIC CLEANING EQUIPMENT | $15,770 | $0 | Implemented |
UD0965 # 05 Y:2017 | 05 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,366 | $2,000 | Implemented |
UD0965 # 09 Y:2017 | 09 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $5,101 | $0 | Implemented |
UD0965 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,437 | $700 | Implemented |