IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
NAICS 311611 Animal (except Poultry) Slaughtering
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0086 # 03 Y:2023 03 2023 METER WASTE WATER $4,239 $1,348 Implemented
NL0086 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $6,202 $6,211 Implemented
MI0420 # 04 Y:2023 04 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $22,620 $52,100 Implemented
MI0420 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $65,480 $580 Implemented
MI0420 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,309 $1,980 Implemented
MI0420 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $15,797 $0 Implemented
MI0420 # 10 Y:2023 10 2023 PAY UTILITY BILLS ON TIME $111 $0 Implemented
MI0420 # 09 Y:2023 09 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,456 $280 Implemented
NL0071 # 02 Y:2022 02 2022 MINIMIZE WATER USAGE $106,955 $72,150 Implemented
NL0071 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $4,500 Implemented
NL0071 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,879 $30,410 Implemented
NL0071 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $407 $2,521 Implemented
NL0071 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $2,400 $9,724 Implemented
TT0260 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $401 $553 Implemented
TT0260 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $783 $700 Implemented
NL0039 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $36,367 $39,000 Implemented
NL0039 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,739 $1,600 Implemented
NL0039 # 04 Y:2019 04 2019 MINIMIZE WATER USAGE $10,832 $1,127 Implemented
NL0039 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,128 $2,497 Implemented
NL0039 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $15,324 $44 Implemented
UD0965 # 10 Y:2017 10 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $41,935 $20,000 Implemented
UD0965 # 03 Y:2017 03 2017 USE AUTOMATIC CLEANING EQUIPMENT $15,770 $0 Implemented
UD0965 # 05 Y:2017 05 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,366 $2,000 Implemented
UD0965 # 09 Y:2017 09 2017 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $5,101 $0 Implemented
UD0965 # 04 Y:2017 04 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,437 $700 Implemented