Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
219
matching recommendationsNAICS | 311613 | Rendering and Meat Byproduct Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0160 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $261 | $657 | Not Implemented |
UD1012 # 18 Y:2020 | 18 | 2020 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,565 | $2,500 | Not Implemented |
UD1012 # 09 Y:2020 | 09 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $27,338 | $0 | Implemented |
UD1012 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,440 | $0 | Not Implemented |
UD1012 # 17 Y:2020 | 17 | 2020 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $24,810 | $35,000 | Implemented |
UD1012 # 16 Y:2020 | 16 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,160 | $0 | Implemented |
UD1012 # 15 Y:2020 | 15 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,548 | $0 | Implemented |
UD1012 # 10 Y:2020 | 10 | 2020 | OPTIMIZE PLANT POWER FACTOR | $145,150 | $100,000 | Not Implemented |
UD1012 # 14 Y:2020 | 14 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,073 | $0 | Implemented |
UD1012 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,521 | $1,000 | Not Implemented |
UD1012 # 08 Y:2020 | 08 | 2020 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $46,434 | $0 | Not Implemented |
UD1012 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,178 | $1,000 | Implemented |
UD1012 # 12 Y:2020 | 12 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $34,941 | $20,000 | Not Implemented |
UD1012 # 06 Y:2020 | 06 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $67,773 | $0 | Implemented |
UD1012 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,706 | $0 | Not Implemented |
UD1012 # 11 Y:2020 | 11 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $86,219 | $9,464 | Not Implemented |
UD1012 # 13 Y:2020 | 13 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $17,175 | $14,500 | Not Implemented |
UD1012 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,380 | $400 | Not Implemented |
UD1012 # 07 Y:2020 | 07 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $49,540 | $21,295 | Implemented |
UD1008 # 09 Y:2019 | 09 | 2019 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $28,777 | $27,800 | Not Implemented |
UD1008 # 10 Y:2019 | 10 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,896 | $500 | Implemented |
UD1008 # 01 Y:2019 | 01 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $4,386 | $0 | Implemented |
UD1008 # 07 Y:2019 | 07 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $5,658 | $0 | Not Implemented |
UD1008 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $3,650 | Implemented |
UD1008 # 08 Y:2019 | 08 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $3,596 | $0 | Not Implemented |