Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
138
matching recommendationsNAICS | 311615 | Poultry Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0279 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $3,760 | $1,407 | Implemented |
UA0279 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,228 | $2,262 | Implemented |
UA0279 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,676 | $8,591 | Implemented |
UA0279 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,760 | $1,000 | Implemented |
LS2311 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,616 | $25 | Implemented |
LS2311 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,014 | $39,200 | Implemented |
LS2311 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,096 | $3,700 | Implemented |
LS2311 # 02 Y:2023 | 02 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,795 | $560 | Implemented |
LE0543 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $210 | $760 | Implemented |
LE0543 # 06 Y:2023 | 06 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,075 | $13,169 | Implemented |
LE0543 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,200 | $9,000 | Implemented |
LE0543 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,298 | $8,400 | Implemented |
LE0543 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $839 | $100 | Implemented |
MZ0317 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,392 | $12,626 | Implemented |
MZ0317 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $607 | $800 | Implemented |
MZ0317 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,246 | $4,000 | Implemented |
NL0047 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $643 | $1,700 | Implemented |
NL0047 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,600 | $6,024 | Implemented |
NL0047 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,234 | $230 | Implemented |
NL0047 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $41,210 | $15,000 | Implemented |
NL0047 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $301 | $1,148 | Implemented |
AM0799 # 08 Y:2020 | 08 | 2020 | USE SYNTHETIC LUBRICANT | $480 | $36 | Implemented |
AM0799 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,080 | $5,060 | Implemented |
AM0799 # 04 Y:2020 | 04 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,900 | $1,750 | Implemented |
AM0799 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,112 | $1,500 | Implemented |