IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

267

matching recommendations
Reset
NAICS 3117 Seafood Product Preparation and Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0027 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $89,704 $333,155 n/a
SJ0027 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $3,400 $0 n/a
SJ0027 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,837 $1,550 n/a
SJ0027 # 02 Y:2024 02 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $32,211 $22,296 n/a
LS2421 # 04 Y:2024 04 2024 INSTALL WIND POWERED ELECTRIC GENERATOR $148,851 $560,000 n/a
LS2421 # 05 Y:2024 05 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $21,228 $141,000 n/a
LS2421 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $8,504 $12,500 n/a
LS2421 # 03 Y:2024 03 2024 USE OTHER WASTE CONCENTRATION METHODS $590,512 $783,539 n/a
LS2421 # 01 Y:2024 01 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $33,742 $15,900 n/a
DL0236 # 09 Y:2024 09 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $57,286 $101,040 n/a
DL0236 # 12 Y:2024 12 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,300 $3,500 n/a
DL0236 # 11 Y:2024 11 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $19,869 $1,512 n/a
DL0236 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $13,849 $0 n/a
DL0236 # 02 Y:2024 02 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $19,869 $2,400 n/a
DL0236 # 06 Y:2024 06 2024 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,131 $0 n/a
DL0236 # 03 Y:2024 03 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $3,343 $1,500 n/a
DL0236 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,945 $28,600 n/a
DL0236 # 10 Y:2024 10 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $23,405 $56,000 n/a
DL0236 # 05 Y:2024 05 2024 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $18,917 $52,500 n/a
DL0236 # 07 Y:2024 07 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,162 $53,200 n/a
DL0236 # 04 Y:2024 04 2024 UPGRADE CONTROLS ON COMPRESSORS $4,721 $1,500 n/a
LS2401 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $370 $75 Implemented
LS2401 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $100 Implemented
LS2401 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,301 $100 Implemented
LS2401 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,640 $180 Implemented