IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

304

matching recommendations
Reset
NAICS 3117 Seafood Product Preparation and Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2415 # 06 Y:2024 06 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $100,020 $225,274 Implemented
UW2415 # 12 Y:2024 12 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $62,298 $19,622 Implemented
UW2415 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,888 $25,000 Implemented
SJ0027 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $3,400 $0 n/a
SJ0027 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,837 $1,550 n/a
SJ0027 # 02 Y:2024 02 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $32,211 $22,296 n/a
SJ0027 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $89,704 $333,155 n/a
SF0626 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,235 $0 n/a
SF0626 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,248 $52,290 n/a
SF0626 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,243 $249,045 n/a
SF0626 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $166 $750 n/a
SF0626 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,227 $12,256 n/a
SF0626 # 04 Y:2024 04 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,979 $27,525 n/a
SF0626 # 05 Y:2024 05 2024 AVOID FROST FORMATION ON EVAPORATORS $10,643 $13,568 n/a
SF0626 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $3,992 $0 n/a
SF0626 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $425 $140 n/a
LS2421 # 04 Y:2024 04 2024 INSTALL WIND POWERED ELECTRIC GENERATOR $148,851 $560,000 Not Implemented
LS2421 # 01 Y:2024 01 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $33,742 $15,900 Not Implemented
LS2421 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $8,504 $12,500 Implemented
LS2421 # 03 Y:2024 03 2024 USE OTHER WASTE CONCENTRATION METHODS $590,512 $783,539 Implemented
LS2421 # 05 Y:2024 05 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $21,228 $141,000 Not Implemented
DL0236 # 04 Y:2024 04 2024 UPGRADE CONTROLS ON COMPRESSORS $4,721 $1,500 Not Implemented
DL0236 # 05 Y:2024 05 2024 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $18,917 $52,500 Not Implemented
DL0236 # 06 Y:2024 06 2024 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,131 $0 Not Implemented
DL0236 # 07 Y:2024 07 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,162 $53,200 Not Implemented