Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
258
matching recommendationsNAICS | 31171 | Seafood Product Preparation and Packaging |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0236 # 02 Y:2024 | 02 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $19,869 | $2,400 | n/a |
DL0236 # 12 Y:2024 | 12 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,300 | $3,500 | n/a |
DL0236 # 11 Y:2024 | 11 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $19,869 | $1,512 | n/a |
DL0236 # 04 Y:2024 | 04 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $4,721 | $1,500 | n/a |
DL0236 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,849 | $0 | n/a |
DL0236 # 06 Y:2024 | 06 | 2024 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,131 | $0 | n/a |
DL0236 # 03 Y:2024 | 03 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $3,343 | $1,500 | n/a |
DL0236 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,945 | $28,600 | n/a |
DL0236 # 10 Y:2024 | 10 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $23,405 | $56,000 | n/a |
DL0236 # 05 Y:2024 | 05 | 2024 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $18,917 | $52,500 | n/a |
DL0236 # 07 Y:2024 | 07 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $22,162 | $53,200 | n/a |
DL0236 # 09 Y:2024 | 09 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $57,286 | $101,040 | n/a |
LS2401 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,640 | $180 | n/a |
LS2401 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,301 | $100 | n/a |
LS2401 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,633 | $42,000 | n/a |
LS2401 # 05 Y:2024 | 05 | 2024 | INSTALL WIND POWERED ELECTRIC GENERATOR | $452,959 | $1,680,000 | n/a |
LS2401 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,761 | $100 | n/a |
LS2401 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $370 | $75 | n/a |
LT8382 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,368 | $8,172 | n/a |
LT8382 # 05 Y:2024 | 05 | 2024 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $2,042 | $4,483 | n/a |
LT8382 # 07 Y:2024 | 07 | 2024 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $8,567 | $56,250 | n/a |
LT8382 # 03 Y:2024 | 03 | 2024 | USE PHOTOCELL CONTROLS | $731 | $328 | n/a |
LT8382 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,755 | $8,100 | n/a |
LT8382 # 06 Y:2024 | 06 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,120 | $600 | n/a |
LT8382 # 01 Y:2024 | 01 | 2024 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,178 | $61,016 | n/a |