Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,542
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0309 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $13,394 | $34,000 | Implemented |
MI0309 # 03 Y:2017 | 03 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,478 | $320 | Implemented |
MI0309 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $4,544 | $1,640 | Implemented |
MI0309 # 05 Y:2017 | 05 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,389 | $1,729 | Implemented |
MI0309 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,090 | $1,882 | Implemented |
MI0309 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,772 | $6,223 | Implemented |
MI0309 # 08 Y:2017 | 08 | 2017 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $649 | $210 | Implemented |
MI0309 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $307 | $1,591 | Implemented |
UU0114 # 01 Y:2017 | 01 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,236 | $180 | Implemented |
UU0114 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $14,409 | $30,000 | Not Implemented |
UU0114 # 03 Y:2017 | 03 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,931 | $0 | Implemented |
UU0114 # 04 Y:2017 | 04 | 2017 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,795 | $1,315 | Not Implemented |
UU0114 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,973 | $39,045 | Implemented |
UU0114 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,345 | $0 | Implemented |
SF0495 # 01 Y:2016 | 01 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,207 | $661 | Implemented |
SF0495 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,370 | $6,127 | Implemented |
SF0495 # 03 Y:2016 | 03 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,562 | $3,136 | Not Implemented |
SF0495 # 04 Y:2016 | 04 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,447 | $8,329 | Implemented |
SF0495 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $2,590 | $6,532 | Implemented |
SF0495 # 06 Y:2016 | 06 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,109 | $0 | Not Implemented |
BD0493 # 01 Y:2016 | 01 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $17,520 | $1,900 | n/a |
BD0493 # 02 Y:2016 | 02 | 2016 | REPLACE BOILER | $7,259 | $14,000 | n/a |
BD0493 # 03 Y:2016 | 03 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,620 | $6,000 | n/a |
BD0493 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,605 | $600 | n/a |
BD0493 # 05 Y:2016 | 05 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,280 | $50 | n/a |