IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,538

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0309 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,772 $6,223 Implemented
MI0309 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,090 $1,882 Implemented
MI0309 # 05 Y:2017 05 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,389 $1,729 Implemented
MI0309 # 03 Y:2017 03 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,478 $320 Implemented
UU0114 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,236 $180 Implemented
UU0114 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $14,409 $30,000 Not Implemented
UU0114 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,931 $0 Implemented
UU0114 # 04 Y:2017 04 2017 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,795 $1,315 Not Implemented
UU0114 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,973 $39,045 Implemented
UU0114 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,345 $0 Implemented
SF0495 # 01 Y:2016 01 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,207 $661 Implemented
SF0495 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,370 $6,127 Implemented
SF0495 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,562 $3,136 Not Implemented
SF0495 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,447 $8,329 Implemented
SF0495 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $2,590 $6,532 Implemented
SF0495 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,109 $0 Not Implemented
BD0493 # 01 Y:2016 01 2016 USE RADIANT HEATER FOR SPOT HEATING $17,520 $1,900 n/a
BD0493 # 02 Y:2016 02 2016 REPLACE BOILER $7,259 $14,000 n/a
BD0493 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,620 $6,000 n/a
BD0493 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,605 $600 n/a
BD0493 # 05 Y:2016 05 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,280 $50 n/a
BD0493 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $932 $20 n/a
BD0493 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $925 $1,050 n/a
BD0493 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $500 n/a
OK0953 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,868 $150 Not Implemented