IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0309 # 08 Y:2017 08 2017 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $649 $210 Implemented
MI0309 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $307 $1,591 Implemented
MI0277 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,740 $7,980 Implemented
MI0277 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,327 $16,640 Implemented
MI0277 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,747 $23,500 Implemented
MI0277 # 04 Y:2015 04 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,899 $4,691 Implemented
MI0277 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,958 $7,530 Implemented
MI0277 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,508 $1,660 Implemented
MI0277 # 07 Y:2015 07 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $4,776 $1,120 Implemented
MI0277 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,698 $639 Implemented
MI0277 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,440 $40 Implemented
MI0277 # 10 Y:2015 10 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,737 $3,280 Implemented
MI0277 # 11 Y:2015 11 2015 USE OPTIMUM THICKNESS INSULATION $1,507 $1,610 Implemented
MI0277 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $1,295 $290 Implemented
MI0277 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $574 $1,400 Implemented
MI0277 # 14 Y:2015 14 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $459 $90 Implemented
MI0274 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,151 $1,660 Implemented
MI0274 # 02 Y:2015 02 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,336 $140 Implemented
MI0274 # 03 Y:2015 03 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $10,584 $14,880 Not Implemented
MI0274 # 04 Y:2015 04 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,327 $4,691 Implemented
MI0274 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,833 $11,640 Implemented
MI0274 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,565 $40 Implemented
MI0274 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,430 $1,710 Implemented
MI0274 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,100 $639 Implemented
MI0274 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,582 $6,871 Implemented