IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,542

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0603 # 15 Y:2006 15 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $874 $4,000 Implemented
MA0603 # 16 Y:2006 16 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $4,000 Implemented
MA0603 # 17 Y:2006 17 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $172 $0 Implemented
MI0128 # 01 Y:2006 01 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $78,238 $4,445 Not Implemented
MI0128 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $19,974 $5,000 Not Implemented
MI0128 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,372 $31,540 Implemented
MI0128 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,248 $1,750 Not Implemented
MI0128 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,703 $1,074 Implemented
MI0128 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,762 $4,800 Not Implemented
MI0128 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,984 $30 Implemented
SU0225 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,891 $0 Implemented
SU0225 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,498 $0 Not Implemented
SU0225 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $12,425 $0 Implemented
SU0225 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,730 $0 Implemented
SU0225 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $23,287 $1,708 Implemented
SU0225 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,994 $1,058 Implemented
SU0225 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $3,373 $250 Implemented
SU0225 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $653 Implemented
SU0225 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $471 $532 Implemented
SU0225 # 10 Y:2006 10 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,864 $20,100 Implemented
SU0225 # 11 Y:2006 11 2006 OPTIMIZE PLANT POWER FACTOR $9,250 $12,757 Implemented
SU0225 # 12 Y:2006 12 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $306 $515 Implemented
SD0373 # 01 Y:2005 01 2005 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $34,083 $56,520 Not Implemented
SD0373 # 02 Y:2005 02 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,494 $3,900 Not Implemented
SD0373 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,208 $0 Not Implemented