Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,542
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0603 # 15 Y:2006 | 15 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $874 | $4,000 | Implemented |
MA0603 # 16 Y:2006 | 16 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $650 | $4,000 | Implemented |
MA0603 # 17 Y:2006 | 17 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $172 | $0 | Implemented |
MI0128 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $78,238 | $4,445 | Not Implemented |
MI0128 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,974 | $5,000 | Not Implemented |
MI0128 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,372 | $31,540 | Implemented |
MI0128 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,248 | $1,750 | Not Implemented |
MI0128 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,703 | $1,074 | Implemented |
MI0128 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,762 | $4,800 | Not Implemented |
MI0128 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,984 | $30 | Implemented |
SU0225 # 01 Y:2006 | 01 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $35,891 | $0 | Implemented |
SU0225 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,498 | $0 | Not Implemented |
SU0225 # 03 Y:2006 | 03 | 2006 | USE SYNTHETIC LUBRICANT | $12,425 | $0 | Implemented |
SU0225 # 04 Y:2006 | 04 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,730 | $0 | Implemented |
SU0225 # 05 Y:2006 | 05 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $23,287 | $1,708 | Implemented |
SU0225 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,994 | $1,058 | Implemented |
SU0225 # 07 Y:2006 | 07 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,373 | $250 | Implemented |
SU0225 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $606 | $653 | Implemented |
SU0225 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $471 | $532 | Implemented |
SU0225 # 10 Y:2006 | 10 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,864 | $20,100 | Implemented |
SU0225 # 11 Y:2006 | 11 | 2006 | OPTIMIZE PLANT POWER FACTOR | $9,250 | $12,757 | Implemented |
SU0225 # 12 Y:2006 | 12 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $306 | $515 | Implemented |
SD0373 # 01 Y:2005 | 01 | 2005 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $34,083 | $56,520 | Not Implemented |
SD0373 # 02 Y:2005 | 02 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,494 | $3,900 | Not Implemented |
SD0373 # 03 Y:2005 | 03 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,208 | $0 | Not Implemented |