IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0841 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $24,631 $155,407 Implemented
MA0841 # 03 Y:2022 03 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $9,761 $49,341 Implemented
MA0841 # 04 Y:2022 04 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,842 $500 Implemented
MA0841 # 05 Y:2022 05 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,033 $7,500 Not Implemented
MA0841 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $253 $234 Implemented
MA0841 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,138 $8,830 Implemented
MA0654 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,876 $9,840 Not Implemented
MA0654 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,377 $18,330 Implemented
MA0654 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,750 $30,000 Implemented
MA0654 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $22,566 $39,500 Not Implemented
MA0603 # 17 Y:2006 17 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $172 $0 Implemented
MA0603 # 15 Y:2006 15 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $874 $4,000 Implemented
MA0603 # 14 Y:2006 14 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,402 $0 Implemented
MA0603 # 13 Y:2006 13 2006 REPAIR OR REPLACE STEAM TRAPS $2,847 $1,600 Not Implemented
MA0603 # 12 Y:2006 12 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,508 $10,500 Not Implemented
MA0603 # 11 Y:2006 11 2006 BURN WASTE OIL FOR HEAT $3,685 $6,500 Implemented
MA0603 # 10 Y:2006 10 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,287 $0 Implemented
MA0603 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,490 $6,000 Not Implemented
MA0603 # 08 Y:2006 08 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,480 $50,000 Implemented
MA0603 # 07 Y:2006 07 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,595 $83,500 Implemented
MA0603 # 06 Y:2006 06 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $24,068 $0 Not Implemented
MA0603 # 05 Y:2006 05 2006 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $26,243 $30,600 Not Implemented
MA0603 # 04 Y:2006 04 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,778 $8,125 Implemented
MA0603 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,920 $83,405 Implemented
MA0603 # 02 Y:2006 02 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $54,146 $2,000 Implemented