Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0841 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,631 | $155,407 | Implemented |
MA0841 # 03 Y:2022 | 03 | 2022 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $9,761 | $49,341 | Implemented |
MA0841 # 04 Y:2022 | 04 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,842 | $500 | Implemented |
MA0841 # 05 Y:2022 | 05 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,033 | $7,500 | Not Implemented |
MA0841 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $253 | $234 | Implemented |
MA0841 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,138 | $8,830 | Implemented |
MA0654 # 04 Y:2009 | 04 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,876 | $9,840 | Not Implemented |
MA0654 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,377 | $18,330 | Implemented |
MA0654 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $15,750 | $30,000 | Implemented |
MA0654 # 01 Y:2009 | 01 | 2009 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $22,566 | $39,500 | Not Implemented |
MA0603 # 17 Y:2006 | 17 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $172 | $0 | Implemented |
MA0603 # 15 Y:2006 | 15 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $874 | $4,000 | Implemented |
MA0603 # 14 Y:2006 | 14 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,402 | $0 | Implemented |
MA0603 # 13 Y:2006 | 13 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $2,847 | $1,600 | Not Implemented |
MA0603 # 12 Y:2006 | 12 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,508 | $10,500 | Not Implemented |
MA0603 # 11 Y:2006 | 11 | 2006 | BURN WASTE OIL FOR HEAT | $3,685 | $6,500 | Implemented |
MA0603 # 10 Y:2006 | 10 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,287 | $0 | Implemented |
MA0603 # 09 Y:2006 | 09 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,490 | $6,000 | Not Implemented |
MA0603 # 08 Y:2006 | 08 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,480 | $50,000 | Implemented |
MA0603 # 07 Y:2006 | 07 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,595 | $83,500 | Implemented |
MA0603 # 06 Y:2006 | 06 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $24,068 | $0 | Not Implemented |
MA0603 # 05 Y:2006 | 05 | 2006 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $26,243 | $30,600 | Not Implemented |
MA0603 # 04 Y:2006 | 04 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $34,778 | $8,125 | Implemented |
MA0603 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,920 | $83,405 | Implemented |
MA0603 # 02 Y:2006 | 02 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $54,146 | $2,000 | Implemented |