IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0035 # 05 Y:2023 05 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $934 $0 Not Implemented
MU0035 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,539 $0 Not Implemented
MU0035 # 06 Y:2023 06 2023 ELIMINATE/REDUCE AN OPERATION $13,378 $0 Not Implemented
MU0035 # 02 Y:2023 02 2023 KEEP EQUIPMENT CLEAN $216 $0 Not Implemented
MU0035 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,081 $374 Not Implemented
MU0035 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,453 $5,164 Not Implemented
UM0461 # 07 Y:2015 07 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,782 $3,000 Not Implemented
UM0461 # 06 Y:2015 06 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $195 $1,000 Not Implemented
UM0461 # 05 Y:2015 05 2015 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $479 $200 Not Implemented
UM0461 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,928 $1,000 Implemented
UM0461 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,057 $2,000 Implemented
UM0461 # 02 Y:2015 02 2015 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,840 $475 Not Implemented
UM0461 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $940 $800 Not Implemented
UM0392 # 04 Y:2011 04 2011 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,205 $130 Not Implemented
UM0392 # 09 Y:2011 09 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $33,030 $37,825 Not Implemented
UM0392 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $630 $1,000 Implemented
UM0392 # 07 Y:2011 07 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $10,240 $13,740 Not Implemented
UM0392 # 06 Y:2011 06 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,528 $66,561 Not Implemented
UM0392 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $781 $1,000 Not Implemented
UM0392 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,083 $500 Not Implemented
UM0392 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $9,765 $5,250 Implemented
UM0392 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,168 $54,459 Implemented
UM0381 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,186 $1,200 Not Implemented
UM0381 # 05 Y:2011 05 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $82 $10 Implemented
UM0381 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,985 $5,032 Implemented