Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0035 # 05 Y:2023 | 05 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $934 | $0 | Not Implemented |
MU0035 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,539 | $0 | Not Implemented |
MU0035 # 06 Y:2023 | 06 | 2023 | ELIMINATE/REDUCE AN OPERATION | $13,378 | $0 | Not Implemented |
MU0035 # 02 Y:2023 | 02 | 2023 | KEEP EQUIPMENT CLEAN | $216 | $0 | Not Implemented |
MU0035 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,081 | $374 | Not Implemented |
MU0035 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,453 | $5,164 | Not Implemented |
UM0461 # 07 Y:2015 | 07 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,782 | $3,000 | Not Implemented |
UM0461 # 06 Y:2015 | 06 | 2015 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $195 | $1,000 | Not Implemented |
UM0461 # 05 Y:2015 | 05 | 2015 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $479 | $200 | Not Implemented |
UM0461 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,928 | $1,000 | Implemented |
UM0461 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,057 | $2,000 | Implemented |
UM0461 # 02 Y:2015 | 02 | 2015 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,840 | $475 | Not Implemented |
UM0461 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $940 | $800 | Not Implemented |
UM0392 # 04 Y:2011 | 04 | 2011 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,205 | $130 | Not Implemented |
UM0392 # 09 Y:2011 | 09 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $33,030 | $37,825 | Not Implemented |
UM0392 # 08 Y:2011 | 08 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $630 | $1,000 | Implemented |
UM0392 # 07 Y:2011 | 07 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,240 | $13,740 | Not Implemented |
UM0392 # 06 Y:2011 | 06 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $30,528 | $66,561 | Not Implemented |
UM0392 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $781 | $1,000 | Not Implemented |
UM0392 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,083 | $500 | Not Implemented |
UM0392 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $9,765 | $5,250 | Implemented |
UM0392 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,168 | $54,459 | Implemented |
UM0381 # 06 Y:2011 | 06 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,186 | $1,200 | Not Implemented |
UM0381 # 05 Y:2011 | 05 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $82 | $10 | Implemented |
UM0381 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,985 | $5,032 | Implemented |