Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0768 # 02 Y:2023 | 02 | 2023 | USE AUTOMATIC FLOW CONTROL | $24,867 | $9,600 | Not Implemented |
OR0768 # 03 Y:2023 | 03 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,178 | $5,693 | Implemented |
OR0768 # 01 Y:2023 | 01 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,535 | $8,125 | Implemented |
OR0735 # 02 Y:2020 | 02 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,510 | $2,925 | Not Implemented |
OR0735 # 03 Y:2020 | 03 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $3,031 | $0 | Implemented |
OR0735 # 01 Y:2020 | 01 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $5,347 | $1,090 | Implemented |
OR0647 # 02 Y:2015 | 02 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,293 | $800 | Not Implemented |
OR0647 # 03 Y:2015 | 03 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $8,286 | $7,123 | Not Implemented |
OR0647 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,576 | $25,575 | Implemented |
OR0647 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,826 | $4,986 | Implemented |
OR0641 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $581 | $1,121 | Implemented |
OR0641 # 04 Y:2014 | 04 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,470 | $1,577 | Implemented |
OR0641 # 03 Y:2014 | 03 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,509 | $8,500 | Not Implemented |
OR0641 # 02 Y:2014 | 02 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,580 | $8,760 | Implemented |
OR0641 # 01 Y:2014 | 01 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,076 | $2,794 | Implemented |
OR0546 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $4,087 | $7,170 | Not Implemented |
OR0546 # 09 Y:2009 | 09 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,251 | $1,456 | Not Implemented |
OR0546 # 08 Y:2009 | 08 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,132 | $13,620 | Not Implemented |
OR0546 # 07 Y:2009 | 07 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,406 | $1,600 | Not Implemented |
OR0546 # 06 Y:2009 | 06 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,466 | $37,682 | Not Implemented |
OR0546 # 05 Y:2009 | 05 | 2009 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $3,220 | $6,680 | Not Implemented |
OR0546 # 03 Y:2009 | 03 | 2009 | OPTIMIZE PLANT POWER FACTOR | $7,200 | $10,500 | Not Implemented |
OR0546 # 02 Y:2009 | 02 | 2009 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $24,190 | $17,000 | Not Implemented |
OR0546 # 01 Y:2009 | 01 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,000 | $350 | Not Implemented |
OR0499 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,960 | $3,700 | Implemented |