IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0239 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,011 $3,011 Not Implemented
UU0239 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,050 $1,400 Not Implemented
UU0239 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $6,144 $7,887 Implemented
UU0239 # 03 Y:2024 03 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $9,905 $9,905 Implemented
UU0239 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $18,178 $2,000 Implemented
UU0239 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,184 $8,000 Implemented
UU0114 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,931 $0 Implemented
UU0114 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,345 $0 Implemented
UU0114 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,973 $39,045 Implemented
UU0114 # 04 Y:2017 04 2017 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,795 $1,315 Not Implemented
UU0114 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $14,409 $30,000 Not Implemented
UU0114 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,236 $180 Implemented
UU0075 # 01 Y:2004 01 2004 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $400 $250 Not Implemented
UU0075 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $980 $4,500 Not Implemented
UU0075 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,540 $8,000 Not Implemented
UU0075 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,270 $1,000 Implemented
UU0075 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,120 $150 Implemented
UU0075 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,700 $8,000 Not Implemented
UU0075 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,590 $1,320 Implemented