IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 31181 Bread and Bakery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0965 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,164 $800 Implemented
GT0965 # 05 Y:2023 05 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $103,640 $350,000 Not Implemented
GT0965 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $927 Implemented
GT0965 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,014 $1,850 Implemented
GT0965 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,363 $800 Not Implemented
GT0964 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $1,788 $8,500 Not Implemented
GT0964 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,786 $50,570 Implemented
GT0964 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,849 $36,015 Not Implemented
GT0964 # 02 Y:2023 02 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $142,026 $175,000 Not Implemented
GT0964 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $78,169 $1,850 Implemented
KS2201 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $868 $1,047 Not Implemented
KS2201 # 09 Y:2022 09 2022 CHECK FOR ACCURACY OF UTILITY / POWER METERS $13,164 $120 Implemented
KS2201 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,572 $61,880 Implemented
KS2201 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $60,974 $540,200 Not Implemented
KS2201 # 03 Y:2022 03 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $1,085 $4,460 Not Implemented
KS2201 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $39,082 $154,800 Implemented
KS2201 # 05 Y:2022 05 2022 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,820 $2,174 Not Implemented
KS2201 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,955 $5,480 Implemented
KS2201 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,137 $60 Implemented
UA0189 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $21,964 $45,000 Not Implemented
UA0189 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,357 $3,000 Implemented
UA0189 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,704 $100 Implemented
UA0189 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,745 $5,828 Implemented
UA0189 # 03 Y:2018 03 2018 USE MINIMUM STEAM OPERATING PRESSURE $3,482 $50 Implemented
UA0189 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $13,298 $50 Not Implemented