Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 31181 | Bread and Bakery Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0956 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,421 | $14,000 | Not Implemented |
UD0956 # 06 Y:2016 | 06 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $26,938 | $30,000 | Not Implemented |
UD0956 # 03 Y:2016 | 03 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,897 | $12,000 | Not Implemented |
UD0956 # 11 Y:2016 | 11 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,070 | $2,500 | Not Implemented |
UD0956 # 12 Y:2016 | 12 | 2016 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $198,366 | $360,000 | Not Implemented |
UD0956 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,229 | $0 | Not Implemented |
UD0956 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $1,966 | $3,394 | Not Implemented |
UD0956 # 10 Y:2016 | 10 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,204 | $10,000 | Not Implemented |
UD0956 # 05 Y:2016 | 05 | 2016 | OPTIMIZE PLANT POWER FACTOR | $8,199 | $12,220 | Not Implemented |
UD0956 # 01 Y:2016 | 01 | 2016 | INSTALL TURBULATORS | $15,641 | $5,625 | Not Implemented |
UD0956 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,566 | $24,600 | Not Implemented |
UD0956 # 09 Y:2016 | 09 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,433 | $40,000 | Not Implemented |
UD0926 # 11 Y:2015 | 11 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,362 | $80,000 | Not Implemented |
UD0926 # 01 Y:2015 | 01 | 2015 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $10,310 | $0 | Not Implemented |
UD0926 # 10 Y:2015 | 10 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,792 | $6,100 | Not Implemented |
UD0926 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,575 | $2,300 | Implemented |
UD0926 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,106 | $31,264 | Not Implemented |
UD0926 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,162 | $5,000 | Not Implemented |
UD0926 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,913 | $2,050 | Not Implemented |
UD0926 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,076 | $100 | Implemented |
UD0926 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,287 | $0 | Implemented |
UD0926 # 03 Y:2015 | 03 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,384 | $1,000 | Not Implemented |
UD0926 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,258 | $0 | Implemented |
UD0903 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $4,126 | $500 | Implemented |
UD0903 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,617 | $500 | Not Implemented |