IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 31181 Bread and Bakery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0956 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,421 $14,000 Not Implemented
UD0956 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $26,938 $30,000 Not Implemented
UD0956 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,897 $12,000 Not Implemented
UD0956 # 11 Y:2016 11 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,070 $2,500 Not Implemented
UD0956 # 12 Y:2016 12 2016 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $198,366 $360,000 Not Implemented
UD0956 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,229 $0 Not Implemented
UD0956 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,966 $3,394 Not Implemented
UD0956 # 10 Y:2016 10 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,204 $10,000 Not Implemented
UD0956 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $8,199 $12,220 Not Implemented
UD0956 # 01 Y:2016 01 2016 INSTALL TURBULATORS $15,641 $5,625 Not Implemented
UD0956 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,566 $24,600 Not Implemented
UD0956 # 09 Y:2016 09 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,433 $40,000 Not Implemented
UD0926 # 11 Y:2015 11 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $20,362 $80,000 Not Implemented
UD0926 # 01 Y:2015 01 2015 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $10,310 $0 Not Implemented
UD0926 # 10 Y:2015 10 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,792 $6,100 Not Implemented
UD0926 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,575 $2,300 Implemented
UD0926 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $13,106 $31,264 Not Implemented
UD0926 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,162 $5,000 Not Implemented
UD0926 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,913 $2,050 Not Implemented
UD0926 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,076 $100 Implemented
UD0926 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,287 $0 Implemented
UD0926 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,384 $1,000 Not Implemented
UD0926 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,258 $0 Implemented
UD0903 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $4,126 $500 Implemented
UD0903 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,617 $500 Not Implemented