IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 31181 Bread and Bakery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0768 # 02 Y:2023 02 2023 USE AUTOMATIC FLOW CONTROL $24,867 $9,600 Not Implemented
OR0768 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,178 $5,693 Implemented
OR0768 # 01 Y:2023 01 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,535 $8,125 Implemented
OR0735 # 02 Y:2020 02 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,510 $2,925 Not Implemented
OR0735 # 03 Y:2020 03 2020 UPGRADE CONTROLS ON COMPRESSORS $3,031 $0 Implemented
OR0735 # 01 Y:2020 01 2020 UPGRADE CONTROLS ON COMPRESSORS $5,347 $1,090 Implemented
OR0647 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,293 $800 Not Implemented
OR0647 # 03 Y:2015 03 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $8,286 $7,123 Not Implemented
OR0647 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,576 $25,575 Implemented
OR0647 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,826 $4,986 Implemented
OR0641 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $581 $1,121 Implemented
OR0641 # 04 Y:2014 04 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,470 $1,577 Implemented
OR0641 # 03 Y:2014 03 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,509 $8,500 Not Implemented
OR0641 # 02 Y:2014 02 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $13,580 $8,760 Implemented
OR0641 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,076 $2,794 Implemented
OR0546 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $4,087 $7,170 Not Implemented
OR0546 # 09 Y:2009 09 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,251 $1,456 Not Implemented
OR0546 # 08 Y:2009 08 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,132 $13,620 Not Implemented
OR0546 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,406 $1,600 Not Implemented
OR0546 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,466 $37,682 Not Implemented
OR0546 # 05 Y:2009 05 2009 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,220 $6,680 Not Implemented
OR0546 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $7,200 $10,500 Not Implemented
OR0546 # 02 Y:2009 02 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $24,190 $17,000 Not Implemented
OR0546 # 01 Y:2009 01 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $350 Not Implemented
OR0499 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,960 $3,700 Implemented