Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 311811 | Retail Bakeries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0493 # 02 Y:2016 | 02 | 2016 | REPLACE BOILER | $7,259 | $14,000 | n/a |
BD0493 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $925 | $1,050 | n/a |
BD0493 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $932 | $20 | n/a |
BD0493 # 05 Y:2016 | 05 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,280 | $50 | n/a |
BD0493 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,605 | $600 | n/a |
BD0493 # 03 Y:2016 | 03 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,620 | $6,000 | n/a |
BD0493 # 01 Y:2016 | 01 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $17,520 | $1,900 | n/a |
BD0493 # 08 Y:2016 | 08 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $188 | $500 | n/a |
UF0444 # 06 Y:2011 | 06 | 2011 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,175 | $4,385 | Not Implemented |
UF0444 # 12 Y:2011 | 12 | 2011 | INSTALL TURBULATORS | $16,282 | $7,500 | Not Implemented |
UF0444 # 11 Y:2011 | 11 | 2011 | COVER OPEN TANKS | $9,431 | $2,321 | Not Implemented |
UF0444 # 10 Y:2011 | 10 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,606 | $930 | Not Implemented |
UF0444 # 09 Y:2011 | 09 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $616 | $0 | Not Implemented |
UF0444 # 08 Y:2011 | 08 | 2011 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $14,978 | $39,066 | Not Implemented |
UF0444 # 07 Y:2011 | 07 | 2011 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,862 | $2,729 | Not Implemented |
UF0444 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,135 | $1,000 | Implemented |
UF0444 # 04 Y:2011 | 04 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,428 | $25,300 | Not Implemented |
UF0444 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,401 | $404 | Implemented |
UF0444 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $19,284 | $813 | Implemented |
UF0444 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,948 | $19,732 | Implemented |
UW0021 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $52,486 | $175,000 | Not Implemented |
UW0021 # 02 Y:2008 | 02 | 2008 | OPERATE BOILERS ON HIGH FIRE SETTING | $20,223 | $49,000 | Not Implemented |
UW0021 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,357 | $5,912 | Not Implemented |
UW0021 # 04 Y:2008 | 04 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,612 | $50,000 | Not Implemented |
UW0021 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,472 | $0 | Not Implemented |