Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 311812 | Commercial Bakeries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0117 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $413 | $1,047 | Not Implemented |
BS0117 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,373 | $350 | Not Implemented |
BS0117 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,573 | $1,650 | Not Implemented |
BS0117 # 05 Y:2019 | 05 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $3,322 | $502 | Not Implemented |
BS0117 # 01 Y:2019 | 01 | 2019 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $32,085 | $5,600 | Not Implemented |
OR0613 # 07 Y:2013 | 07 | 2013 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $706 | $448 | Implemented |
OR0613 # 06 Y:2013 | 06 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $991 | $95 | Implemented |
OR0613 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,364 | $17,632 | Not Implemented |
OR0613 # 04 Y:2013 | 04 | 2013 | RECOVER AND REUSE WASTE MATERIAL | $3,635 | $8,000 | Not Implemented |
OR0613 # 03 Y:2013 | 03 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,262 | $36,000 | Implemented |
OR0613 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $3,040 | $2,913 | Not Implemented |
OR0613 # 01 Y:2013 | 01 | 2013 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $11,140 | $5,000 | Implemented |
OR0511 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,600 | $5,000 | Implemented |
OR0511 # 09 Y:2006 | 09 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,400 | $2,600 | Not Implemented |
OR0511 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,800 | $4,500 | Not Implemented |
OR0511 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,300 | $6,300 | Implemented |
OR0511 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,800 | $0 | Implemented |
OR0511 # 04 Y:2006 | 04 | 2006 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $14,400 | $13,700 | Implemented |
OR0511 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,500 | $7,340 | Not Implemented |
OR0511 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $35,500 | $8,000 | Implemented |
OR0511 # 01 Y:2006 | 01 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,200,000 | $400,000 | Implemented |