IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
NAICS 311812 Commercial Bakeries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1019 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $44,370 $657,982 n/a
CM1019 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $93,012 $807,500 n/a
CM1019 # 03 Y:2023 03 2023 INCREASE EFFICIENCY OF TRUCKS $43,375 $394,000 n/a
CM1019 # 04 Y:2023 04 2023 INSTALL SENSORS TO DETECT AND AVOID JAMS $7,058 $30,570 n/a
IP0172 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,584 $8,088 Not Implemented
IP0172 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,315 $14,588 Not Implemented
IP0172 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,870 $1,313 Not Implemented
IP0172 # 02 Y:2023 02 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $512 $83 Not Implemented
IP0172 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $132 Not Implemented
GT0965 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,164 $800 Implemented
NT0003 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,020 $185,220 Not Implemented
NT0003 # 05 Y:2023 05 2023 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $2,238 $3,193 Not Implemented
NT0003 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $3,289 $1,600 Not Implemented
NT0003 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,623 $24,707 Not Implemented
NT0003 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $12,262 $21,725 Not Implemented
GT0965 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,363 $800 Not Implemented
GT0965 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,014 $1,850 Implemented
NT0003 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,267 $5,705 Not Implemented
GT0965 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $927 Implemented
GT0965 # 05 Y:2023 05 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $103,640 $350,000 Not Implemented
TT0290 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $21,000 $2,000 Not Implemented
TT0290 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $1,150 Implemented
TT0290 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,477 $10,500 Not Implemented
TT0290 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $1,755 Implemented
TT0290 # 01 Y:2023 01 2023 UPGRADE OBSOLETE EQUIPMENT $106,623 $200,000 Implemented