Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 31182 | Cookie, Cracker, and Pasta Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0026 # 10 Y:2024 | 10 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $706 | $1,151 | n/a |
SJ0026 # 09 Y:2024 | 09 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,261 | $1,017 | n/a |
SJ0026 # 08 Y:2024 | 08 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $4,132 | $25,650 | n/a |
SJ0026 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $400 | $0 | n/a |
SJ0026 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,177 | $9,200 | n/a |
SJ0026 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,978 | $9,706 | n/a |
SJ0026 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $123,957 | $18,405 | n/a |
SJ0026 # 03 Y:2024 | 03 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,192 | $888 | n/a |
SJ0026 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $653 | $607 | n/a |
SJ0026 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $79,569 | $266,719 | n/a |
IC0302 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $215 | $1,256 | Implemented |
IC0302 # 10 Y:2024 | 10 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,478 | $12,801 | Not Implemented |
IC0302 # 09 Y:2024 | 09 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,215 | $4,414 | Not Implemented |
IC0302 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,385 | $1,118 | Implemented |
IC0302 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $320 | $0 | Not Implemented |
IC0302 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,025 | $350 | Implemented |
IC0302 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,613 | $0 | Not Implemented |
IC0302 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $376 | $0 | Not Implemented |
IC0302 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $411 | $0 | Implemented |
IC0302 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,001 | $2,566 | Implemented |
UU0239 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $18,178 | $2,000 | Implemented |
UU0239 # 03 Y:2024 | 03 | 2024 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $9,905 | $9,905 | Implemented |
UU0239 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $6,144 | $7,887 | Implemented |
UU0239 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,050 | $1,400 | Not Implemented |
UU0239 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,011 | $3,011 | Not Implemented |