Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,698
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1079 # 03 Y:2024 | 03 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $40,904 | $6,808 | n/a |
UD1079 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $25,599 | $2,200 | n/a |
UD1079 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $2,183 | $830 | n/a |
UD1079 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $20,373 | $76,500 | n/a |
UD1079 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,311 | $1,011 | n/a |
UD1079 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $338 | $0 | n/a |
UD1079 # 05 Y:2024 | 05 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,667 | $0 | n/a |
UD1079 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,618 | $164,640 | n/a |
UD1079 # 07 Y:2024 | 07 | 2024 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $30,626 | $96,273 | n/a |
LE0555 # 03 Y:2024 | 03 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $49,962 | $35,200 | n/a |
LE0555 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $306,071 | $500,000 | n/a |
LE0555 # 09 Y:2024 | 09 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $43,046 | $90,000 | n/a |
LE0555 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,514 | $16,000 | n/a |
LE0555 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $15,790 | $7,920 | n/a |
LE0555 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $4,850 | $4,800 | n/a |
LE0555 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,403 | $21,160 | n/a |
LE0555 # 08 Y:2024 | 08 | 2024 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $101,613 | $202,500 | n/a |
LE0555 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $40,483 | $4,800 | n/a |
KS2324 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $57,559 | $312,824 | n/a |
KS2324 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,738 | $5,480 | n/a |
KS2324 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $2,028 | $4,064 | n/a |
KS2324 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,860 | $598,739 | n/a |
KS2324 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,344 | $22,467 | n/a |
KS2324 # 04 Y:2023 | 04 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $12,787 | $8,320 | n/a |
KS2324 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $32,201 | $0 | n/a |