IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

752

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0585 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,918 $756 Implemented
UF0585 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $0 Implemented
UF0585 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $45,977 $0 Implemented
UF0585 # 07 Y:2022 07 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $19,210 $10,000 Implemented
TT0282 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,200 $15,000 Implemented
TT0282 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,290 $58,960 Implemented
TT0282 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $42,363 $21,260 Implemented
TT0282 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,725 $152,000 Implemented
TT0282 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $360,908 $51,360 Implemented
TT0282 # 01 Y:2022 01 2022 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $816,618 $2,873,364 Implemented
MI0410 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,438 $580 Implemented
MI0410 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $7,151 $7,280 Implemented
MI0410 # 05 Y:2022 05 2022 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,575 $597 Implemented
MI0410 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,493 $140 Implemented
MI0410 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,695 Implemented
IP0161 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $94 $0 Implemented
IP0161 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $0 Implemented
IP0161 # 03 Y:2022 03 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,152 $88 Implemented
IP0161 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $128 $328 Implemented
IP0161 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $262 $724 Implemented
MI0408 # 01 Y:2022 01 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $21,620 $960 Implemented
MI0408 # 02 Y:2022 02 2022 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $5,828 $2,327 Implemented
MI0408 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,767 $580 Implemented
MI0408 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,972 $120 Implemented
MI0408 # 06 Y:2022 06 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $644 $570 Implemented