IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2324 # 07 Y:2023 07 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $57,559 $312,824 n/a
KS2324 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $63,860 $598,739 n/a
KS2324 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $2,028 $4,064 n/a
KS2324 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,344 $22,467 n/a
KS2324 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,738 $5,480 n/a
KS2324 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,201 $0 n/a
KS2324 # 04 Y:2023 04 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $12,787 $8,320 n/a
GT0960 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,573 $800 Implemented
GT0960 # 04 Y:2021 04 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $39,614 $149,000 Not Implemented
GT0960 # 05 Y:2021 05 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $175,754 $2,009,756 Not Implemented
GT0960 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,666 $8,719 Implemented
GT0960 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,810 $1,850 Implemented
UF0576 # 10 Y:2022 10 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $1,400 $1,449 Implemented
UF0576 # 09 Y:2022 09 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,828 $2,002 Implemented
UF0576 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,965 $25,427 Implemented
UF0576 # 11 Y:2022 11 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $284,508 $0 Implemented
UF0576 # 12 Y:2022 12 2022 IMPROVE SPACE COMFORT CONDITIONING $19,893 $5,851 Implemented
UF0576 # 04 Y:2022 04 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $21,495 $6,314 Implemented
UF0576 # 08 Y:2022 08 2022 INSTALL TURBULATORS $3,726 $7,500 Not Implemented
UF0576 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,479 $16,283 Implemented
UF0576 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,147 $0 Implemented
UF0576 # 02 Y:2022 02 2022 DIRECT WARMEST AIR TO COMBUSTION INTAKE $30,987 $10,183 Implemented
UF0576 # 07 Y:2022 07 2022 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,306 $765 Implemented
UF0576 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $55,456 $51,203 Implemented
GT0949 # 06 Y:2020 06 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $461 $425 Not Implemented