Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2022 |
Principal Product | Bread and donuts |
NAICS | 311999 - All Other Miscellaneous Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 132,000 |
Annual Production | 36,687 Units |
Production Hrs. Annual | 8,736 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $712,337 | 9,517,300 | kWh | $0.07 |
Electricity Demand | $78,424 | 16,061 | kW-months/year | $4.88 |
Electricity Fees | $24,770 | - | $ | - |
Natural Gas | $335,377 | 54,726 | MMBtu | $6.13 |
TOTAL ENERGY COSTS | $1,150,908 | |||
RECOMMENDED SAVINGS* | $477,190 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $473,464 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $55,456 Cost: $51,203 |
$49,966 | 666,211 | $5,490 | 1,124 | - | - | - | - | - | - |
$49,966 666,211 kWh |
$5,490 1,124 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $30,987 Cost: $10,183 |
- | - | - | - | $30,987 | 5,057 | - | - | - | - |
- - kWh |
- - kW-months/year |
$30,987 5,057 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $29,479 Cost: $16,283 |
$26,999 | 359,983 | $2,480 | 508 | - | - | - | - | - | - |
$26,999 359,983 kWh |
$2,480 508 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $21,495 Cost: $6,314 |
$(-161) | (-2,152) | $(-103) | (-21) | - | - | $21,760 | - | - | - |
$(-161) (-2,152) kWh |
$(-103) (-21) kW-months/year |
- - MMBtu |
$21,760 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $16,965 Cost: $25,427 |
$16,965 | 226,198 | - | - | - | - | - | - | - | - |
$16,965 226,198 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $6,147 Cost: - |
$5,931 | 79,076 | - | - | - | - | $101 | - | $115 | - |
$5,931 79,076 kWh |
- - kW-months/year |
- - MMBtu |
$101 - $ |
$115 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $5,306 Cost: $765 |
$5,306 | 70,750 | - | - | - | - | - | - | - | - |
$5,306 70,750 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1222 INSTALL TURBULATORS |
Savings: $3,726 Cost: $7,500 |
- | - | - | - | $3,726 | 608 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,726 608 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,828 Cost: $2,002 |
- | - | - | - | $1,828 | 298 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,828 298 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $1,400 Cost: $1,449 |
- | - | - | - | $1,400 | 228 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,400 228 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS |
Savings: $284,508 Cost: - |
- | - | - | - | - | - | $284,508 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$284,508 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $19,893 Cost: $5,851 |
$(-1,481) | (-19,740) | $(-386) | (-79) | - | - | $21,760 | - | - | - |
$(-1,481) (-19,740) kWh |
$(-386) (-79) kW-months/year |
- - MMBtu |
$21,760 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $477,190 Cost: $126,977 |
$103,525 | 1,380,326 | $7,481 | 1,532 | $37,941 | 6,192 | $328,129 | - | $115 | - | $103,525 1,380,326 kWh |
$7,481 1,532 kW-months/year |
$37,941 6,192 MMBtu |
$328,129 - $ |
$115 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $473,464 Cost: $119,477 |
$103,525 | 1,380,326 | $7,481 | 1,532 | $34,215 | 5,583 | $328,129 | - | $115 | - | $103,525 1,380,326 kWh |
$7,481 1,532 kW-months/year |
$34,215 5,583 MMBtu |
$328,129 - $ |
$115 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material |