IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,762

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2406 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $21,720 $14,950 n/a
UL2406 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $112 $406 n/a
UL2406 # 09 Y:2024 09 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $35,350 $159,350 n/a
LS2412 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $2,908 $275 n/a
LS2412 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $872 $135 n/a
LS2412 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,703 $150 n/a
LS2412 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,854 $5,915 n/a
LS2411 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,962 $12,050 n/a
LS2411 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,595 $50 n/a
LS2411 # 03 Y:2024 03 2024 IMPROVE SPACE COMFORT CONDITIONING $26,395 $18,900 n/a
LS2411 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $72,136 $480,000 n/a
LS2411 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $45 n/a
TR0056 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,902 $2,500 n/a
TR0056 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $1,159 n/a
TR0056 # 02 Y:2023 02 2023 USE SOLAR HEAT FOR HEAT $45,845 $271,563 n/a
DL0239 # 08 Y:2024 08 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,185 $51,431 n/a
DL0239 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $61,029 $10,000 n/a
DL0239 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $61,587 $28,225 n/a
DL0239 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,306 $1,250 n/a
DL0239 # 03 Y:2024 03 2024 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $37,050 $110,000 n/a
DL0239 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $397,405 $140,000 n/a
DL0239 # 05 Y:2024 05 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,543 $2,247 n/a
DL0239 # 02 Y:2024 02 2024 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,623 $17,500 n/a
DL0239 # 09 Y:2024 09 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $44,586 $1,934 n/a
LT8400 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $11,040 $26,888 n/a