IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,762

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0016 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $437 $604 Implemented
BS0016 # 04 Y:2013 04 2013 COVER OPEN TANKS $4,197 $1,600 Implemented
BS0016 # 05 Y:2013 05 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,127 $6,826 Not Implemented
BS0016 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,648 $1,185 Not Implemented
BD0424 # 01 Y:2013 01 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $51,971 $201,300 Not Implemented
BD0424 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,607 $16,210 Implemented
BD0424 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,355 $25 Not Implemented
BD0424 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,401 $2,700 Not Implemented
BD0424 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,527 $8,640 Implemented
BD0424 # 06 Y:2013 06 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,030 $11,000 Not Implemented
BD0424 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $7,685 $2,257 Implemented
BD0424 # 08 Y:2013 08 2013 INSTALL TURBULATORS $3,136 $3,000 Not Implemented
BD0424 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,163 $1,660 Implemented
BD0424 # 10 Y:2013 10 2013 USE PHOTOCELL CONTROLS $374 $435 Not Implemented
UD0877 # 01 Y:2013 01 2013 ELIMINATE THIRD SHIFT $75,782 $0 Implemented
UD0877 # 02 Y:2013 02 2013 METER WASTE WATER $18,660 $1,000 Implemented
UD0877 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,981 $14,250 Not Implemented
UD0877 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,143 $8,200 Not Implemented
UD0877 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,183 $1,000 Not Implemented
UD0877 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,095 $0 Implemented
UD0877 # 07 Y:2013 07 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $262 $500 Not Implemented
UD0877 # 08 Y:2013 08 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $61,182 $25,000 Implemented
UD0877 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $685 $2,000 Implemented
UD0874 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $23,112 $20,000 Not Implemented
UD0874 # 02 Y:2013 02 2013 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,400 $200 Implemented