IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,762

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0168 # 15 Y:2010 15 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $445 $0 Implemented
BD0366 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $9,620 $210 Implemented
BD0366 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,837 $2,700 Implemented
BD0366 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,342 $1,000 Not Implemented
BD0366 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,922 $0 Not Implemented
BD0366 # 05 Y:2010 05 2010 IMPROVE LUBRICATION PRACTICES $2,368 $600 Implemented
BD0366 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,606 $3,000 Not Implemented
BD0366 # 07 Y:2010 07 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,299 $18,000 n/a
BD0366 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,581 $6,400 Implemented
BD0366 # 09 Y:2010 09 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $565 $0 Not Implemented
LL0323 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116,211 $8,680 Implemented
LL0323 # 02 Y:2009 02 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,990 $990 Not Implemented
LL0323 # 03 Y:2009 03 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,498 $990 Not Implemented
LL0323 # 04 Y:2009 04 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $682 $623 Not Implemented
LL0323 # 05 Y:2009 05 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $315 $190 Not Implemented
OK0783 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $29,321 $280,000 Not Implemented
OK0783 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112 $887 Implemented
OK0783 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $775 Implemented
OK0783 # 04 Y:2009 04 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,327 $26,066 Not Implemented
OK0783 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,219 $15,039 Not Implemented
OK0783 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,392 $67,320 Not Implemented
OK0783 # 07 Y:2009 07 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $18,978 $3,810 Implemented
OK0783 # 08 Y:2009 08 2009 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $50,901 $15,708 Implemented
OK0783 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,399 $0 Implemented
AM0565 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,800 $14,966 Implemented