IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,762

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0361 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $1,614 $1,036 Implemented
SF0361 # 06 Y:2008 06 2008 HEAT WATER WITH EXHAUST HEAT $24,668 $16,423 Not Implemented
SF0361 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,413 $4,592 Implemented
SF0361 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,039 $1,502 Not Implemented
UW0016 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $892 $0 Not Implemented
UW0016 # 06 Y:2008 06 2008 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,510 $10 Not Implemented
UW0016 # 05 Y:2008 05 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,625 $8,550 Implemented
UW0016 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $7,000 $500 Implemented
UW0016 # 03 Y:2008 03 2008 REPAIR OR REPLACE STEAM TRAPS $5,490 $5,600 Not Implemented
UW0016 # 02 Y:2008 02 2008 REPLACE BOILER $10,000 $20,000 Not Implemented
UW0016 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,638 $0 Implemented
WV0377 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,957 $5,000 Implemented
WV0377 # 02 Y:2008 02 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $14,777 $18,980 Not Implemented
WV0377 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,568 $25,978 Implemented
WV0377 # 04 Y:2008 04 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,122 $231 Implemented
WV0377 # 05 Y:2008 05 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,506 $1,000 Implemented
WV0377 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $5,730 $815 Implemented
WV0377 # 07 Y:2008 07 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,754 $3,084 Not Implemented
WV0377 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,670 $0 Implemented
WV0377 # 09 Y:2008 09 2008 UPGRADE CONTROLS ON COMPRESSORS $2,273 $1,830 Not Implemented
WV0377 # 10 Y:2008 10 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,858 $7,053 Not Implemented
WV0377 # 11 Y:2008 11 2008 INSULATE BARE EQUIPMENT $1,335 $710 Implemented
WV0377 # 12 Y:2008 12 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,192 $1,202 Implemented
SF0352 # 01 Y:2008 01 2008 USE PHOTOCELL CONTROLS $651 $664 Not Implemented
SF0352 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,436 $3,094 Not Implemented