IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,762

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0273 # 17 Y:2003 17 2003 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $6,279 $6,714 Not Implemented
IA0332 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,039 $44 Not Implemented
IA0332 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,420 $544 Not Implemented
IA0332 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $277 Implemented
IA0332 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,053 $8,284 Implemented
IA0332 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48 $67 Implemented
IA0332 # 06 Y:2003 06 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $43,344 $11,000 Implemented
SF0266 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $1,280 $960 Not Implemented
SF0266 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,484 $1,369 Not Implemented
SF0266 # 03 Y:2003 03 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,765 $2,200 Not Implemented
SF0266 # 04 Y:2003 04 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,660 $7,712 Not Implemented
SF0266 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,906 $260 Not Implemented
SF0266 # 06 Y:2003 06 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,400 $24,250 Not Implemented
SF0266 # 07 Y:2003 07 2003 INCREASE USE OF AUTOMATION $179,712 $500,000 Not Implemented
AM0439 # 01 Y:2003 01 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $910,000 $435,000 Implemented
AM0439 # 02 Y:2003 02 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,200 $1,200 Implemented
AM0439 # 03 Y:2003 03 2003 REDUCE OR ELIMINATE WASTE $36,600 $220 Implemented
AM0439 # 04 Y:2003 04 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,700 $270 Implemented
AM0439 # 05 Y:2003 05 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,600 $500 Implemented
AM0439 # 06 Y:2003 06 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,200 $7,600 Implemented
AM0439 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,400 $1,000 Implemented
AM0439 # 08 Y:2003 08 2003 REPAIR OR REPLACE STEAM TRAPS $7,600 $1,120 Implemented
AM0439 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $4,890 $550 Implemented
AM0439 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $980 Implemented
AM0439 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,290 $1,460 Implemented