Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,762
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2303 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,831 | $336,395 | Not Implemented |
UL2303 # 06 Y:2023 | 06 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $7,161 | $21,450 | Not Implemented |
UL2303 # 07 Y:2023 | 07 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $6,194 | $25,900 | Not Implemented |
LT8373 # 01 Y:2023 | 01 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $98,547 | $220,400 | n/a |
LT8373 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,015 | $37,491 | n/a |
LT8373 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,033 | $14,614 | n/a |
LT8373 # 04 Y:2023 | 04 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $96,000 | $0 | n/a |
LT8373 # 05 Y:2023 | 05 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $24,164 | $0 | n/a |
LT8373 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $22,998 | $53,560 | n/a |
LT8373 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,264 | $99,888 | n/a |
NT0005 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,885 | $1,258 | Not Implemented |
NT0005 # 02 Y:2023 | 02 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $6,240 | $0 | Not Implemented |
NT0005 # 03 Y:2023 | 03 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $832,000 | $100,000 | Not Implemented |
NT0005 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,375 | $6,539 | Not Implemented |
NT0005 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,433 | $9,008 | Not Implemented |
NT0005 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,810 | $0 | Not Implemented |
MI0415 # 01 Y:2022 | 01 | 2022 | INSTALL OCCUPANCY SENSORS | $10,535 | $3,084 | Not Implemented |
MI0415 # 02 Y:2022 | 02 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,767 | $960 | Implemented |
MI0415 # 03 Y:2022 | 03 | 2022 | REPLACE BOILER | $73,846 | $170,000 | Not Implemented |
MI0415 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,830 | $7,950 | Not Implemented |
MI0415 # 05 Y:2022 | 05 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $142,120 | $2,400 | Not Implemented |
MI0415 # 06 Y:2022 | 06 | 2022 | INCREASE EFFICIENCY OF TRUCKS | $15,778 | $12,180 | Not Implemented |
SF0594 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,580 | $0 | Not Implemented |
SF0594 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,143 | $0 | Not Implemented |
SF0594 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $38,807 | $8,920 | Not Implemented |