IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0926 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,061 $100,000 Not Implemented
OK0926 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,746 $28,000 Not Implemented
OK0926 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,480 $22,750 Implemented
OK0926 # 03 Y:2015 03 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,134 $0 Not Implemented
OK0870 # 04 Y:2013 04 2013 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $20,022 $105,120 Not Implemented
OK0870 # 03 Y:2013 03 2013 DEVELOP A REPAIR/REPLACE POLICY $1,212 $2,500 Not Implemented
OK0870 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,957 $0 Implemented
OK0870 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,384 $0 Implemented
TT0094 # 06 Y:2012 06 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,111 $150 Not Implemented
TT0094 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,034 $0 Not Implemented
TT0094 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $9,871 $2,250 Not Implemented
TT0094 # 08 Y:2012 08 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $42,760 $8,000 Not Implemented
TT0094 # 09 Y:2012 09 2012 UPGRADE CONTROLS ON COMPRESSORS $2,473 $1,600 Not Implemented
TT0094 # 10 Y:2012 10 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,016 $11,318 Not Implemented
TT0094 # 11 Y:2012 11 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $254 $300 Not Implemented
TT0094 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,869 $4,800 Not Implemented
TT0094 # 13 Y:2012 13 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $170 $411 Not Implemented
TT0094 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $12,041 $2,000 Not Implemented
TT0094 # 04 Y:2012 04 2012 ISOLATE HOT OR COLD EQUIPMENT $3,658 $150 Not Implemented
TT0094 # 03 Y:2012 03 2012 DISCONNECT BALLASTS $872 $0 Not Implemented
TT0094 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $742 $0 Not Implemented
OK0783 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,392 $67,320 Not Implemented
OK0783 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,219 $15,039 Not Implemented
OK0783 # 04 Y:2009 04 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,327 $26,066 Not Implemented
OK0783 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $775 Implemented