Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2324 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $57,559 | $312,824 | n/a |
KS2324 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,860 | $598,739 | n/a |
KS2324 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $2,028 | $4,064 | n/a |
KS2324 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,344 | $22,467 | n/a |
KS2324 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,738 | $5,480 | n/a |
KS2324 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $32,201 | $0 | n/a |
KS2324 # 04 Y:2023 | 04 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $12,787 | $8,320 | n/a |
GT0960 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,573 | $800 | Implemented |
GT0960 # 04 Y:2021 | 04 | 2021 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $39,614 | $149,000 | Not Implemented |
GT0960 # 05 Y:2021 | 05 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $175,754 | $2,009,756 | Not Implemented |
GT0960 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,666 | $8,719 | Implemented |
GT0960 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,810 | $1,850 | Implemented |
UF0576 # 10 Y:2022 | 10 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,400 | $1,449 | Implemented |
UF0576 # 09 Y:2022 | 09 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,828 | $2,002 | Implemented |
UF0576 # 05 Y:2022 | 05 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,965 | $25,427 | Implemented |
UF0576 # 11 Y:2022 | 11 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $284,508 | $0 | Implemented |
UF0576 # 12 Y:2022 | 12 | 2022 | IMPROVE SPACE COMFORT CONDITIONING | $19,893 | $5,851 | Implemented |
UF0576 # 04 Y:2022 | 04 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $21,495 | $6,314 | Implemented |
UF0576 # 08 Y:2022 | 08 | 2022 | INSTALL TURBULATORS | $3,726 | $7,500 | Not Implemented |
UF0576 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,479 | $16,283 | Implemented |
UF0576 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,147 | $0 | Implemented |
UF0576 # 02 Y:2022 | 02 | 2022 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $30,987 | $10,183 | Implemented |
UF0576 # 07 Y:2022 | 07 | 2022 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,306 | $765 | Implemented |
UF0576 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,456 | $51,203 | Implemented |
GT0949 # 06 Y:2020 | 06 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $461 | $425 | Not Implemented |