Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0610 # 03 Y:2021 | 03 | 2021 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $12,856 | $33,120 | Not Implemented |
WV0610 # 08 Y:2021 | 08 | 2021 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,217 | $19,800 | Not Implemented |
WV0610 # 11 Y:2021 | 11 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $2,566 | $733 | Implemented |
WV0610 # 04 Y:2021 | 04 | 2021 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $5,861 | $600 | Implemented |
WV0610 # 12 Y:2021 | 12 | 2021 | INSULATE BARE EQUIPMENT | $409 | $488 | Implemented |
WV0610 # 02 Y:2021 | 02 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $23,895 | $37,803 | Not Implemented |
WV0610 # 06 Y:2021 | 06 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,869 | $3,900 | Implemented |
WV0610 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,994 | $14,525 | Implemented |
WV0610 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,654 | $100 | Implemented |
WV0610 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,772 | $4,186 | Not Implemented |
WV0610 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,437 | $2,340 | Implemented |
WV0610 # 09 Y:2021 | 09 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,674 | $1,700 | Implemented |
DL0151 # 01 Y:2015 | 01 | 2015 | USE CORRECT SIZE STEAM TRAPS | $12,870 | $2,380 | Not Implemented |
DL0151 # 02 Y:2015 | 02 | 2015 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $37,680 | $12,400 | Not Implemented |
DL0151 # 03 Y:2015 | 03 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $60,250 | $20,000 | Not Implemented |
DL0151 # 04 Y:2015 | 04 | 2015 | OPERATE BOILERS ON HIGH FIRE SETTING | $10,860 | $4,610 | Not Implemented |
DL0151 # 05 Y:2015 | 05 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $7,730 | $11,520 | Not Implemented |
DL0151 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,550 | $14,400 | Not Implemented |
DL0151 # 07 Y:2015 | 07 | 2015 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,970 | $4,480 | Not Implemented |
DL0151 # 08 Y:2015 | 08 | 2015 | MINIMIZE WATER USAGE | $80,640 | $200,250 | Not Implemented |
WV0446 # 15 Y:2012 | 15 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,151 | $70 | Implemented |
WV0446 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,208 | $21,000 | Not Implemented |
WV0446 # 10 Y:2012 | 10 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,393 | $423 | Not Implemented |
WV0446 # 16 Y:2012 | 16 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,334 | $1,625 | Not Implemented |
WV0446 # 05 Y:2012 | 05 | 2012 | IMPROVE LUBRICATION PRACTICES | $10,748 | $2,034 | Not Implemented |