IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0684 # 03 Y:2025 03 2025 UPGRADE CONTROLS ON COMPRESSORS $3,312 $5,557 n/a
WV0684 # 02 Y:2025 02 2025 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,930 $12,005 n/a
WV0684 # 04 Y:2025 04 2025 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,894 $6,400 n/a
WV0684 # 06 Y:2025 06 2025 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $2,729 $3,800 n/a
WV0684 # 05 Y:2025 05 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,760 $7,928 n/a
WV0684 # 10 Y:2025 10 2025 INSULATE BARE EQUIPMENT $279 $153 n/a
WV0684 # 01 Y:2025 01 2025 REDUCE VENTILATION AIR $35,325 $5,420 n/a
WV0684 # 09 Y:2025 09 2025 INSTALL OCCUPANCY SENSORS $458 $1,800 n/a
WV0684 # 08 Y:2025 08 2025 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $866 $1,550 n/a
WV0684 # 07 Y:2025 07 2025 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,711 $5,800 n/a
WV0610 # 03 Y:2021 03 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $12,856 $33,120 Not Implemented
WV0610 # 08 Y:2021 08 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,217 $19,800 Not Implemented
WV0610 # 11 Y:2021 11 2021 DEVELOP A REPAIR/REPLACE POLICY $2,566 $733 Implemented
WV0610 # 04 Y:2021 04 2021 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,861 $600 Implemented
WV0610 # 12 Y:2021 12 2021 INSULATE BARE EQUIPMENT $409 $488 Implemented
WV0610 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $23,895 $37,803 Not Implemented
WV0610 # 06 Y:2021 06 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,869 $3,900 Implemented
WV0610 # 09 Y:2021 09 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,674 $1,700 Implemented
WV0610 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,994 $14,525 Implemented
WV0610 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,437 $2,340 Implemented
WV0610 # 07 Y:2021 07 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,772 $4,186 Not Implemented
WV0610 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,654 $100 Implemented
DL0151 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $60,250 $20,000 Not Implemented
DL0151 # 02 Y:2015 02 2015 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $37,680 $12,400 Not Implemented
DL0151 # 01 Y:2015 01 2015 USE CORRECT SIZE STEAM TRAPS $12,870 $2,380 Not Implemented