Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 3119 | Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0282 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,290 | $58,960 | Implemented |
TT0282 # 01 Y:2022 | 01 | 2022 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $816,618 | $2,873,364 | Implemented |
TT0282 # 08 Y:2022 | 08 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $542 | $1,120 | Not Implemented |
TT0282 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,200 | $15,000 | Implemented |
TT0282 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $360,908 | $51,360 | Implemented |
TT0282 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $99,184 | $280,000 | Not Implemented |
TT0282 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,725 | $152,000 | Implemented |
TT0282 # 05 Y:2022 | 05 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $42,363 | $21,260 | Implemented |
TT0190 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,110 | $15,000 | Not Implemented |
TT0190 # 04 Y:2017 | 04 | 2017 | OPTIMIZE PLANT POWER FACTOR | $3,337 | $8,000 | Not Implemented |
TT0190 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $280 | $1,000 | Not Implemented |
TT0190 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $88 | $200 | Implemented |
TT0190 # 02 Y:2017 | 02 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $29,422 | $57,000 | Not Implemented |
TT0190 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,543 | $127,654 | Not Implemented |
TT0125 # 02 Y:2014 | 02 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $764 | $505 | Not Implemented |
TT0125 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $724 | $1,000 | Not Implemented |
TT0125 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $148 | $240 | Not Implemented |
TT0125 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $388 | $360 | Not Implemented |
TT0125 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $724 | $720 | Not Implemented |
TT0125 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,282 | $550 | Not Implemented |
TT0125 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $11,367 | $1,500 | Implemented |
TT0114 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42 | $0 | Implemented |
TT0114 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,529 | $125 | Implemented |
TT0114 # 04 Y:2013 | 04 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,310 | $9,125 | Not Implemented |
TT0114 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $6,033 | $5,950 | Implemented |