IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0282 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,290 $58,960 Implemented
TT0282 # 01 Y:2022 01 2022 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $816,618 $2,873,364 Implemented
TT0282 # 08 Y:2022 08 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $542 $1,120 Not Implemented
TT0282 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,200 $15,000 Implemented
TT0282 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $360,908 $51,360 Implemented
TT0282 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $99,184 $280,000 Not Implemented
TT0282 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,725 $152,000 Implemented
TT0282 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $42,363 $21,260 Implemented
TT0190 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,110 $15,000 Not Implemented
TT0190 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $3,337 $8,000 Not Implemented
TT0190 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $280 $1,000 Not Implemented
TT0190 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $88 $200 Implemented
TT0190 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $29,422 $57,000 Not Implemented
TT0190 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,543 $127,654 Not Implemented
TT0125 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $764 $505 Not Implemented
TT0125 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $724 $1,000 Not Implemented
TT0125 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $148 $240 Not Implemented
TT0125 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $388 $360 Not Implemented
TT0125 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $724 $720 Not Implemented
TT0125 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,282 $550 Not Implemented
TT0125 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $11,367 $1,500 Implemented
TT0114 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42 $0 Implemented
TT0114 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $13,529 $125 Implemented
TT0114 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,310 $9,125 Not Implemented
TT0114 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $6,033 $5,950 Implemented